December 2023 Interim Financial Report
Released
Released
Announcement PDF
Australia’s future in bioenergy and renewables
Interim Financial Report
for the half-year ended
31 December 2023
Delorean Corporation Limited
ACN 638 111 127
Vision Statement
To be recognised as Australia and New Zealand’s leading emerging
renewable energy generator and retailer, led by its fast-growing
bioenergy infrastructure footprint.
Mission Statement
To build, own and operate the largest portfolio of commercially
successful renewable energy infrastructure in Australia and New Zealand,
measured by value of developed assets and quantity
of renewable electricity, heat and gas produced.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
2
Table Of Contents
Appendix 4D .................................................................................................................................................... 4
Corporate Directory ........................................................................................................................................ 6
Half-year ended 31 December 2023 at a glance ............................................................................................. 7
Directors’ Report ........................................................................................................................................... 10
Auditor’s Independence Declaration ............................................................................................................ 23
Consolidated Statement of Profit or Loss and Other Comprehensive Income ............................................. 24
Consolidated Statement of Financial Position .............................................................................................. 25
Consolidated Statement of Changes in Equity .............................................................................................. 26
Consolidated Statement of Changes in Equity (continued) .......................................................................... 27
Consolidated Statement of Cash Flows......................................................................................................... 28
Notes to the Consolidated Financial Statements .......................................................................................... 29
Directors’ Declaration ................................................................................................................................... 40
Independent Auditor’s Review Report.......................................................................................................... 41
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
3
Appendix 4D
1. Company details
Name of entity:
ABN:
Reporting period:
Previous period:
Delorean Corporation Limited
62 638 111 127
For the half-year ended 31 December 2023
For the half-year ended 31 December 2022
2. Results for announcement to the market
Revenues from ordinary activities
down
64% to
6,580,649
Profit from ordinary activities after tax attributable to
the owners of Delorean Corporation Limited
up
144% to
495,563
Profit for the half-year attributable to the owners of
Delorean Corporation Limited
up
144% to
495,563
Comments
The profit for the consolidated entity after providing for income tax and non-controlling interest
amounted to $495,563 (31 December 2022: Loss $1,123,471).
Refer to the Review of Operations section included within the Directors’ Report of the attached Financial
Report for the half-year ended 31 December 2023.
3. Net tangible assets
Reporting
period
Cents
Net tangible assets per ordinary security
1.96
Previous
period
Cents
5.03
4. Control gained over entities
Not applicable.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
4
5. Loss of control over entities
Not applicable.
6. Details of associates and joint venture entities
Not applicable.
7. Audit qualification or review
Details of review dispute or qualification (if any):
The financial statements were subject to a review by the auditors and the review report is attached as
part of the Interim Financial Report.
8. Attachments
Details of attachments (if any):
The Interim Financial Report of Delorean Corporation Limited for the half-year ended 31 December 2023
is attached.
9. Signed
Hamish Jolly
Executive Chairman
29 February 2024
Perth, Western Australia
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
5
Corporate Directory
Directors
Mr Hamish Jolly
Mr Joseph Oliver
Mr David McArthur
Mr Steve Gostlow
ASX Code
Shares: DEL
Company Secretary
Mr David McArthur
Country of Incorporation and Domicile
Australia
Legal Form of Entity
Public Company
Contact Details
deloreancorporation.com.au
info@deloreancorporation.com.au
+61 8 6147 7575
Registered and Principal Office
Ground Floor
1205 Hay Street
WEST PERTH WA 6005
Postal Address
Ground Floor
1205 Hay Street
WEST PERTH WA 6005
Auditors
RSM Australia Partners
Level 32, Exchange Tower
2 The Esplanade
PERTH WA 6000
Bank
Commonwealth Bank of Australia
Level 14B, 300 Murray Street
Perth WA 6000
Share Registry
Automic Group
Level 5, 191 St Georges Terrace
PERTH WA 6000
Telephone: 1300 288 664
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
6
Half-year ended 31 December 2023 at a glance
Revenue for 1H FY2024 was $6.58m (excluding R&D tax offset and other income).
In 1H FY2024, Delorean realised an EBITDA profit of $1.3m.
Received the Yarra Valley Water $53m project development approval and in January 2024 Delorean
commenced construction of the project. Site works are now underway for the Company’s fourth and
largest bioenergy project to date. Suppliers for majority of the project’s work packages were
contracted during the period, with fabrication of long lead items underway.
Cash balance of $4.879m as at 31 December 2023, comprising $1.460m in term deposits supporting
cash-backed prudential and contract bonds and $3.419m in available cash for working capital.
Successfully reached an agreement with Palisade Impact to vary the terms of the convertible notes,
extending the repayment date for the principal of the convertible notes until 31 October 2025.
Engaged with a shortlist of potential investors with the objective of securing an alternative investment
partner for its two shovel-ready bioenergy projects, SA1 and VIC1 (investment circa $60m). The
undertaking of these build/own/operate projects remains subject to completion of this diligence and
the FID being made to proceed.
Continued the development with Brickworks on a jointly-owned bioenergy plant in NSW. Progressed
through concept stage into full development approval. The plant will supply renewable gas to
Brickworks’ manufacturing operations, with the further intent to roll out plants at Brickworks sites
nationally.
Progressed a new agreement to undertake feasibility work for a major organisation based on grainbased feedstock.
Advanced the Company’s Infrastructure Development Portfolio.
Developed design and process intellectual property (IP) for bioenergy projects across the organic
sector, from clean agricultural residues, to contaminated commercial and industrial waste, in addition
to municipal food and green organic streams.
Successfully completed ISO accreditation audit for ISO 9001, 14001, 45001
Implemented enhancements in the project management processes and systems.
Furthered the development of relationships and partnerships with leading industrial, utility, and
energy players across Australia.
Advanced the Company’s ESG Strategy.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
7
Chairman’s Address
“The first half of FY2024 was a pivot point for Delorean Corporation. The company
successfully closed out its legacy pre-COVID EPC construction projects, with all the
complexities of that difficult period for the global construction sector fully
resolved. The Company received Notice to Proceed to construct its fourth and
largest bioenergy project for Yarra Valley Water (worth $53m and now in active
build from January 2024).
This half year Delorean reports a return to profit and is active in bringing its next
four build/own/operate bioenergy infrastructure projects to FID - NSW1 (with
Brickworks), SA1, VIC1 and QLD1 - together worth circa $144m, to underpin a
potentially stellar growth path for Delorean in terms of construction work but
also downstream free cashflows from high-yielding infrastructure ownership.”
Delorean is unchallenged now as Australia’s leading bioenergy infrastructure developer, builder, owner and
emerging operator, in an environment where demand for renewable natural gas is already massive and
continues to grow, and the tsunami of available organic waste continues to build with Australia’s national
targets for 50% diversion of organics from landfill by 2030 starting to get traction.
International and local investor interest in Australia’s organic waste and renewable gas sectors has led to a
renewed investor focus on Delorean’s projects, and the Company is working with some significant
counterparties to close out a platform of project finance for these projects, including the shovel-ready SA1
and VIC1 projects.
With the Yarra Valley Water project now fully under way, Delorean is extrapolating towards an uplifted full
year profit, and currently maintains a healthy cash balance ($4.879m at 31 December 2023), noting its
commitments to provide bank guarantees in support of construction contracts.
Under Delorean’s national partnership with Australian brick and tile manufacturer Brickworks (market cap
~$4.47B), the fully funded development continues on NSW1, the first jointly-owned bioenergy plant in NSW.
Planning applications have been prepared for the project, ready for formal submission in Q3 FY24. The plant
will supply renewable gas to Brickworks’ manufacturing operations, with the further intent to roll out plants
at Brickworks sites nationally.
Meantime, in H1 FY2024 Delorean was in negotiations with the Queensland Government for a $5m grant in
support of the construction and commissioning of the Company’s $32m QLD1 project (now awarded in
February 2024).
In the second half of FY2024, Delorean’s focus will be on the profitable delivery of the Yarra Valley Project,
planning submissions and resolution of commercial project finance for the NSW1 Brickworks project, and close
out of project finance on the SA1 and VIC1 projects to progress these projects into build, while actively
developing the QLD1 project.
More widely, the Company is in active business development for more than three additional
build/own/operate and third party EPC projects with counterparties in the grain handling, mining, and waste
management sectors.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
8
In February 2024, the Company successfully reached an agreement with Palisade Impact to vary the terms of
the $5m convertible note, extending the repayment date for the principal of the convertible notes until 31
October 2025.
All up, Delorean Corporation delivered a solid first half result and is confident of an uplifted full year profit.
The Company is delivering the biggest bioenergy facility in Australia. It is at the epicentre of investor interest
in both the waste management and renewable gas sectors, and is closing in on its goal to roll out a backbone
of Delorean-owned bioenergy infrastructure projects across Australia, supported by some of Australia’s most
iconic companies including Brickworks and Australian Gas Infrastructure Group.
I thank our current shareholders for their ongoing support and our committed Delorean Corporation team.
The Delorean Board is bullish on the outlook for continued growth through FY2024 and into FY2025.
Yours sincerely,
Hamish Jolly
Executive Chair & Co-Founder
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
9
Directors’ Report
The Directors present their report together with the financial statements of Delorean Corporation Limited
(“Delorean” or “the Company” or “DEL”) and its subsidiaries (“the Consolidated Entity”) for the half year ended
31 December 2023 and the auditor’s report thereon.
Our Board
Delorean’s Board comprises a balance of strong and committed executive leadership through its Co-founders,
Executive Chair Hamish Jolly and Managing Director Joseph Oliver, matched with Steve Gostlow’s deep
experience and company growth track record in the Australian waste sector with Tox Free Solutions Ltd, and
David McArthur’s decades of experience in the complexities of ASX-listed businesses. The Board functions well
with the Non-Executive Directors providing guidance on finance, performance management and M&A
strategy. Together, the Directors hold 42.19% of DEL’s issued capital and are motivated to guide the Company
to meet its growth and profitability targets and realise the Company’s vision.
Strong Leadership
Hamish Jolly
Executive Chair & Co-Founder
Hamish is a seasoned executive and holds a Bachelor of Business (Business Law and Accounting) and is a
Member of the Institute of Chartered Accountants in Australia and New Zealand. He is a former Director of
Strategy and Ventures at Bankwest, and former CEO of Greening Australia, one of Australia’s largest
environmental NGO’s.
Joseph Oliver
Managing Director & Co-Founder
Joe has 15 years’ experience in engineering, power generation and renewable energy across both Australasia and
Europe. Prior to Delorean, Joe worked for Edina Ltd, specialising in power generation. Joe has been involved in
developing the UK Anaerobic Digestion sector, delivering over 10 facilities nationwide through both Farmgen Ltd
and Monsal Ltd.
Steve Gostlow
Non-Executive Director
Steve has over 20 years’ experience in the waste management industry. He was Managing Director of Tox Free
Solutions Ltd (Toxfree) for 16 years where he developed Toxfree into one of Australia’s largest waste
management companies. Steve has formal governance qualifications as a Graduate of the Australian Institute of
Company Directors.
David McArthur
Non-Executive Director & Company Secretary
David is a Chartered Accountant, with over 30 years’ experience. David has recently sat on the board of a number
of listed companies including Lodestar Minerals Ltd (ASX: LSR), Xstate Resources Ltd (ASX:XST) as well as Harvest
Technology Ltd (ASX:HTC). Additionally, he was the Chair of the Audit and Risk Management Committee for all
three.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
10
Directors’ Report (continued)
Operating and Financial Review
Principal Activities
Delorean is a leading builder and developer of bioenergy infrastructure throughout Australia. The principal
activities of the Consolidated Entity during the financial year were:
•
•
•
•
Renewable energy asset investment
Development
Construction
Tank and infrastructure fabrication
Key Investment Highlights
Unique and proven track record of delivering award-winning, innovative and successful Australasian
bioenergy projects.
Strong pipeline of bioenergy projects under development to capitalise on the growth of Australian
bioenergy market.
A leading force in advancing Australia’s bioenergy sector and providing unique solutions to address
especially hard to abate sectors.
Strong ESG credentials with TCFD and global ESG standards alignment, multiple ESG certifications, and
formal sustainability reporting.
Ideally positioned to capitalise on the national drive towards zero organic waste to landfill and
decarbonisation of energy.
Strategy
The core focus of the business is to develop, construct, own and operate bioenergy infrastructure in Australia.
Revenue is generated through the acceptance of organic waste and agricultural residues, the generation of
renewable electricity, and the production of renewable natural gas.
In addition, Delorean currently constructs bioenergy projects for third parties in Australia and New Zealand
and maintains licenses for the retailing of electricity and gas. The Company’s energy retail activities are
confined to the monetisation of energy exclusively from the bioenergy assets constructed or developed,
owned and operated by Delorean.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
11
Directors’ Report (continued)
Operating and Financial Review (continued)
Vertically Integrated Renewable Energy Business
The business comprises three interoperable divisions:
EPC Projects progressing with DEL-owned Project Development and Build Pipeline
The following graphic sets out an overview of Delorean projects, completed, under construction, under
development and in the pipeline.
Image 1: Delorean Corporation Projects across Australia and New Zealand
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
12
Directors’ Report (continued)
Operating and Financial Review (continued)
Overview
Delorean Corporation’s activities in the half year ending December 2023 continued to support and refine the
Company’s strategic direction and ongoing growth. Delorean is committed to shaping a cleaner energy future
through its vertically integrated renewable energy model. During the first half of FY2024, Delorean fully closedout its pre-COVID legacy construction projects, and received Notice to Proceed under its construction contract
with Yarra Valley Water (YVW) to build YVW’s second bioenergy, being the largest in Australia and Delorean’s
fourth major project.
Delorean reported a return to profit and is active in bringing its next four build/own/operate bioenergy
infrastructure projects to FID together worth circa $144m.
Delorean Engineering Division
Delorean’s Engineering Division delivers engineering design, construction and operation/maintenance services
for third parties under contract, and for Delorean Infrastructure Division’s build/own/operate projects.
Yarra Valley Water, VIC Bioenergy Plant
Project Background
Location: Lilydale, Victoria – circa $53M + $6.5M O&M contract value
Delorean Corporation’s Engineering Division is in contract for the design, construction, operation, and
maintenance of Yarra Valley Water’s second food waste to energy plant at Lilydale, Victoria. This new facility
will be one of the largest food waste to energy facilities of its kind in Australia.
The total design and construction contract sum is $53M. Additionally, the contract includes a two-year
agreement for operations and maintenance (and an option for digestate management) by Delorean with a
value of $6.5M.
Project Update
During the reporting period, Delorean Corporation’s Engineering Division was awarded Notice to Proceed
under the Yarra Valley Water project contract. Following completion of final regulatory and development
approvals, site works are now underway as the project enters the full construction phase.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
13
Directors’ Report (continued)
Operating and Financial Review (continued)
WA Bioenergy Plant
Project Background
Location: WA – circa $100,000 contract value
Project Update
Over the past 12 months, Delorean has been undertaking test work on a variety of feedstock available on site
at key operational grain-handling assets. Following completion of a Desktop Study and Design to enable the
client to assess the feasibility of anaerobic digestion plants to offset on site power usage, work continued this
quarter, with Design Development and Value Engineering work underway. This follows on from DEL’s previous
success in delivering the Blue Lake Milling project, which processes similar agricultural residues for energy
production.
Delorean Infrastructure Division
Delorean’s Infrastructure Division is responsible for development, ownership and operation of commercialscale anaerobic digestion bioenergy facilities in Australia.
During H1 FY2024, Delorean was actively connecting with a shortlist of potential investors with whom the
Company was previously unable to engage during Palisade Impact’s exclusivity period, with the objective of
securing an alternative investment partner for the SA1 and VIC 1 projects.
Both projects are shovel ready for full construction pending project finance.
VIC1 Stanhope Bioenergy Plant
Project Background
Location: Stanhope, Victoria
In Stage 1, this facility will process 54,000TPA of organic waste. It will generate 15,400 MWh per annum of
green electricity and contribute to emissions reduction of 69,400tCO2e per annum. This is equivalent to
powering 3,850 homes with green energy every year.
Project Update
Project is shovel ready for full construction pending project finance.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
14
Directors’ Report (continued)
Operating and Financial Review (continued)
Image 2: VIC1 Stanhope Bioenergy Plant Render
SA1 Salisbury Bioenergy Plant
Project Background
Location: Salisbury, South Australia
This project will be one of Australia’s first to create green gas to mains utilising commercial and industrial
organic waste.
In Stage 1 it will process 70,000TPA of organic waste, generating 200 TJs of biomethane per annum. This will
contribute to 92,200 tonnes per annum emissions reduction, the equivalent of powering 5,120 homes with
green energy per year.
Project Update
Project is shovel ready for full construction pending project finance.
Image 3: SA1 Salisbury Bioenergy Plant Render
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
15
Directors’ Report (continued)
Operating and Financial Review (continued)
Brickworks Bioenergy Project (NSW1)
Project Background
Brickworks Building Products (ASX: BKW) and Delorean are party to a landmark collaboration agreement to
build and operate bioenergy facilities that will be co-located at Brickworks’ brick manufacturing sites. The
facilities will convert organic waste to green gas and electricity for use in Brickworks’ operations.
The collaboration has commenced with Brickworks’ Horsley Park brick manufacturing site in NSW, and if
successful there is the potential for the model to be rolled out on a national basis.
Project Update
In H1 FY2024, Brickworks Building Products and Delorean continued to progress the Development Stage of the
NSW1 project under a Master Services Agreement (MSA). The Company has been active in preparing
documentation for full planning/development approval ready for full submission in Q3 FY2024.
Progress on the development application activities has been in line with expectations and the development
work remains materially on track.
Image 4: NSW1 Bioenergy Plant Render
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
16
Directors’ Report (continued)
Operating and Financial Review (continued)
QLD1 Bioenergy Plant
Project Background
At full capacity, this site will process approximately 130,000TPA of organic waste with the primary energy
output being either biomethane or green electricity. The facility is likely to be developed with a staged
approach, with Stage 1 seeing 70,000TPA of waste accepted. This is equivalent to powering 9,000 homes with
green energy every year (based on full capacity).
Project Update
The Company is currently preparing to progress the project from feasibility stage to development approval.
The project is expected to be FID-ready by late CY2024.
In February 2024, DEL announced the award of a $5m grant under the Queensland Government’s Resource
Recovery Industry Development Program. The Department of State Development and Infrastructure grant is
to be applied towards the construction, commissioning and operation of Delorean’s QLD 1 bioenergy facility
project.
Subject to conditions precedent the grant will be available on or before 31 December 2024 and must be utilized
by 30 December 2028.
Image 5: QLD1 Bioenergy Plant Render
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
17
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Energy Retail Division
Delorean’s Energy Retail Division remains inactive, pending a future scale up of its retail operations as
Delorean’s Infrastructure assets come onstream.
Delorean intends to retain its WA and National retail electricity and Victorian Gas licenses on an ongoing basis
in support of the Company’s rollout of bioenergy infrastructure across Australia.
Delorean Corporate
Environment, Social and Governance
Delorean remains proud to be advancing its commitment to sustainability. In October 2023, Delorean
published its second annual ESG Report.
This report provides our stakeholders a comprehensive analysis of the Group’s Environmental, Social and
Governance (ESG) performance, highlighting key sustainability milestones achieved during the Financial Year
2023. Additionally, it offers an update on our continued progress towards future sustainability goals.
Planned Activity – 2H FY2024
•
•
•
•
Select a preferred Infrastructure Projects Investor towards moving Delorean’s SA1 and VIC1 projects
into construction.
Progress NSW1 project through formal planning and development approval submission, and work on
detailed commercial terms and project finance options with Brickworks.
Progress from siteworks through to full construction on Delorean Engineering’s Yarra Valley Water
project.
Progress the development of its QLD1 project.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
18
Directors’ Report (continued)
Operating and financial review (continued)
Financial results and condition
The net profit for the half-year ended 31 December 2023 after income tax was $495,563 (2022: Loss
$1,123,471) with an EBITDA (Earnings before Interest, Tax, Depreciation & Amortisation) of $1,319,520 (2022:
Loss $2,315,363) as summarised in the below table.
Summary of results
EBITDA is a financial measure which is not prescribed by Australian Accounting Standards.
31 December
2023
$
31 December
2022
$
495,563
(1,123,471)
Interest & financing costs
640,850
107,348
Interest income
(11,780)
(5,631)
Income tax expense / (benefit)
21,020
(1,499,660)
Depreciation
173,867
206,051
1,319,520
(2,315,363)
Profit / (Loss) after income tax expense:
EBITDA add backs:
EBITDA
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
19
Directors’ Report (continued)
Operating and financial review (continued)
Financial results and condition (continued)
Summary of results (continued)
The Consolidated Entity comprises three operating segments being the Energy Retail Division, Engineering
Division and Infrastructure Division. Unallocated balances include the Consolidated Entity’s corporate
balances. A summary of the associated segment results is set out below:
Energy Retail Division
Revenue
1HY24
$
90,027
1HY23
$
15,398,683
EBITDA
(16,374)
(213,648)
Energy Retail discontinued substantially all its operation in December 2022, but retained all of its existing
energy retail licenses in WA and the Eastern States to underpin its bioenergy infrastructure asset pipeline.
Engineering Division
Revenue
1HY24
$
5,520,847
1HY23
$
2,517,564
EBITDA
1,960,925
(438,216)
1H FY2024 EBITDA shows the impact of the Yarra Valley Water project on the results of the Engineering
Division. As the Group’s main project during this period, it is the driver for the turnaround in results to a profit
for the half year. With site possession received in January 2024, the Group looks forward to seeing the
Engineering Division continue to deliver this project profitably through to completion. The small loss in the
previous period reflects the impact of the Group’s COVID-impacted projects, which were closed out in the
previous financial year.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
20
Directors’ Report (continued)
Operating and financial review (continued)
Financial results and condition (continued)
Summary of results (continued)
Infrastructure Division
Revenue
1HY24
$
969,775
1HY23
$
161,344
EBITDA
180,815
(32,274)
Revenue for the Infrastructure Division relates to the Brickworks development contract in both periods. The
increase in revenue and EBITDA for the 1H FY2024 period shows the increased level of activity on the project
in this half year, as development work accelerates. Outside of Brickworks, the majority of expenditure in this
Division is capitalised to the Bioenergy portfolio of assets in the Infrastructure pipeline.
Complete details of our operating segments are disclosed in the financial statements Note 2: Operating
Segments.
Significant changes in the state of affairs
There were no significant changes in the state of affairs of the Consolidated Entity during the financial year.
Environmental Regulation
Waste management activities are subject to significant environmental and other regulation. Key legislation
that the Consolidated Entity is required to comply with includes legislation relating to the environment and
the protection of the environment.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2023
21
Directors’ Report (continued)
Share Options
Unissued shares under options
At the date of this report unissued ordinary shares of the Company under option are:
Exercise price
Expiry date
(cents)
Number of options
31-03-25
20
6,250,000
12-04-25
25
14,000,000
30-11-26
14
1,500,000
All unissued shares are ordinary shares of the Company. These options do not entitle the holder to participate
in any share issue of the Company. Further details in relation to the share-based payments to directors are
included in the Remuneration Report.
Shares issued on exercise of options
During the half-year, no shares were issued as a result of the exercise of options. Since the end of the halfyear, no options have been converted.
Auditor’s Independence Declaration
A copy of the auditor's independence decl
Share your feedback
Discover