Results Presentation and DEL Infrastructure Pivot Strategy
Delorean Corporation Ltd
FY25 4E Preliminary Results Presentation &
DEL Infrastructure Pivot Strategy
August 2025
www.deloreancorporation.com.au
Delorean Corporation
Disclaimer
Important Notice & Disclaimer
This document is confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This document is neither a prospectus nor an offer to subscribe for Shares. The purpose of this presentation is to provide general information
about Delorean Corporation Ltd (“Delorean” or the “Company”). This presentation is current as at 29 August 2025 (unless otherwise stated herein) and the information contained in it is in a summary form and does not purport to be complete. The
information in this presentation remains subject to change without notice. It is not recommended that any person makes any investment decision in relation to the Company based solely on this presentation.
This presentation does not necessarily contain all information which maybe material to the making of a decision in relation to the Company. Any investor should make their own independent assessment and determination as to the Company’s
prospects prior to making any investment decision and should not rely on the information in this presentation for that purpose.
This presentation does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold securities in the Company. The securities issued by the Company are considered speculative and there is no guarantee
that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. This presentation is not, and does not constitute, an offer to sell, or the solicitation,
invitation or recommendation of an offer to buy, any securities in any jurisdiction, including the United States, and neither this presentation, nor any of the information contained herein, shall form the basis of any contract or commitment. The
information in the presentation does not constitute an advertisement for an offer or proposed offer of securities and does not constitute a representation that an offering will occur. No person is authorised to give information or make any
representation that an offering will occur.
Any securities of Delorean have not been, and will not be, registered under the U.S. Securities Act or the securities laws of any state or other jurisdiction of the United States and, if there is an offer of securities, may not be offered or sold in the United
States except in transactions exempt from or not subject to, the registration requirements of the U.S. Securities Act and any other applicable securities laws.
This presentation is presented for informational purposes only. It is not intended to be, and is not, a prospectus, product disclosure statement, offering memorandum or private placement memorandum for the purpose of Chapter 6D of the
Corporations Act 2001.
Except for statutory liability which cannot be excluded, the Company, its officers, employees and advisers expressly disclaim any responsibility for, and make no representations or warranty for, the accuracy or completeness of the material contained in
this presentation and exclude all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. The Company
accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any obligation to furnish the person with any further information.
This presentation contains “forward-looking statements” and comments about future events, including statements about Delorean’s expectations about the performance of its business. Forward-looking statements may include words such as
“anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “out-look”, “upside”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”, and other similar expressions. Indications of, and guidance on, future earnings and financial position
and performance are also forward-looking statements. Forward-looking statements, opinions and estimates provided in this presentation are based on assumptions and contingencies which are subject to change without notice. Forward-looking
statements including projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied upon as an indication, prediction or guarantee of future performance. Actual results may differ materially from
those expressed or implied in such statements and these differences maybe material. The forward-looking statements in this presentation involve known and unknown risks and other factors, many of which are beyond the control of, or unknown to,
Delorean, its directors, officers and employees, and may involve significant elements of subjective judgement and assumptions as to future events which may or may not be correct.
Such forward looking statements are based on information available to Delorean as at the date of this presentation. Recipients are cautioned not to place undue reliance on forward looking statements and except as required by law or regulation,
Delorean assumes no liability to update these forward-looking statements. Such statements speak only as of the date hereof, and Delorean has no obligation to update or revise any such statements to reflect any change in events, conditions or
circumstances on which any such statement is based.
No representation or warranty, express or implied, is made by the Company that the matters stated in this presentation will be achieved or prove to be correct. Recipients of this presentation must make their own investigations and inquiries regarding
all assumptions, risks, uncertainties and contingencies which may affect the future operations of the Company or the Company’s securities.
The Company does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully consider whether the
securities issued by the Company are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position.
2
Delorean Corporation
Company Overview
DELOREAN CORPORATION (ASX: DEL) IS
AUSTRALIA’S LEADING DEVELOPER OF
BIOENERGY INFRASTRUCTURE
Delorean is building a network of assets across Australia using
mature in-vessel anaerobic digestion technology to produce
renewable gas, renewable electricity and biogenic carbon dioxide
from organic waste diverted from landfill. Delorean has pioneered
this sector in Australia and built a track record delivering highyielding projects helping to transform and decarbonise Australia’s
energy sector.
DIVERSIFIED INCOME – DELOREAN’S VERTICALLY INTEGRATED MODEL DERIVES INCOME FROM THREE SOURCES
INFRASTRUCTURE
ENGINEERING
• Engineering, Procurement, and Construction (EPC)
Contract Margins
• Operation & Maintenance (O&M) Contract Margins
•
•
•
•
Sale of Renewable Natural Gas (Biomethane)
Sale of Renewable Biogenic Liquid CO₂ (LCO2)
Gate Fees for Acceptance of Organic Waste
Sale of Liquid Fertilizer (future upside)
ENERGY RETAIL
• Trading of Environmental Green Credits:
- Australian Carbon Credit Units (ACCUs),
- Renewable Gas Guarantees of Origin (RGGOs)
- Large-scale Generation Certificates (LGCs)
- Biogenic CO₂ certification (future upside)
3
• Future Energy Contracts
Delorean Corporation
Co-Founders and Leadership
DELOREAN’S BOARD COMPRISES A BALANCE OF STRONG AND COMMITTED EXECUTIVE LEADERSHIP WITH
DEEP EXPERTISE IN BIOENERGY, WASTE, GAS, FINANCE, AND ASX GOVERNANCE.
Hamish Jolly
Executive Chair
Joseph Oliver
Managing Director
Steve Gostlow
Non-Executive Director
Surena Ho
Non-Executive Director
Michael Phillip
Non-Executive Director
Aidan Flynn
Chief Financial Officer &
Company Secretary
Neil Conquest
Chief Operating Officer
Experience:
Experience:
Experience:
Experience:
Experience:
Experience:
Experience:
Hamish is a co-founder of Delorean
and has jointly led the company
since its inception
Joseph (Joe) is a co-founder of
Delorean and has jointly led the
company since its inception
- Has led the delivery of 4 bioenergy
facilities in Australia and NZ
- Has led the design and delivery of 4
bioenergy facilities in Australia and NZ
Over 20 years’ in Australian
and international energy
industry, including 15 years in
oil and gas
Over 25 years’ global financial
markets experience with a
strong background in finance
and credit investing
Over 20 years’ international
leadership experience delivering
major infrastructure and energy
projects in over 65 countries
- 15+ years experience in bioenergy
and renewable energy sector in
Australasia and Europe
- Senior roles with Osaka Gas,
Chevron, Alinta, Woodside
- Founding Chief Investment
Officer of Tanarra Capital
Special Situations division
Over 25 years’ comprehensive
financial leadership experience,
including 18 years as CFO, with
expertise in renewable energy,
construction, and debt finance.
- Extensive public and private sector
experience including in investment
development, finance and
innovation, renewable energy and
technology commercialisation
Over 20 years’ experience in the
waste management industry,
having grown Tox Free Solutions
Ltd into one of Australia’s
largest waste management
companies.
- Extensive background in
construction and engineering
- Managing Director, Tox Free
Solutions Ltd (16 years)
- Strong governance background
- Financial leadership, M&A,
and commercialisation of gas
projects
company
- Led 26+ international power
projects in multiple emerging
markets
- Extensive experience in securing
and supporting debt finance for
growing companies.
- Global operations and project
delivery leadership
- Strong ASX-listed
experience
Delorean Corporation
Investment Highlights
✓
Unique and proven track record of delivering award-winning,
innovative and successful Australasian bioenergy projects.
✓
Strong pipeline of bioenergy projects under development to
capitalise on the growth of Australian bioenergy market.
✓
A leader in advancing Australia’s bioenergy sector and providing
unique solutions to address especially hard to abate sectors.
✓
Strong ESG credentials with TCFD and global ESG standards
alignment, multiple ESG certifications, and formal sustainability
reporting
✓
Ideally positioned to capitalise on the national drive towards zero
organic waste to landfill and decarbonisation of energy.
AUSTRALIA'S FUTURE IN BIOENERGY & RENEWABLES
www.deloreancorporation.com.au ASX:DEL
Delorean Corporation
Company Overview – Pivot to Build-Own-Operate Infrastructure
WITH A TRACK RECORD OF DEVELOPING BIOENERGY INFRASTRUCTURE AS A LEADING BIOENERGY EPC CONTRACTOR,
DELOREAN IS TRANSFORMING INTO AN OWNER AND OPERATOR WITH 5 PROJECTS CURRENTLY IN THE PIPELINE
Our Strategy
THIRD PARTY CONTRACTS (TRACK RECORD)
COMPLETED
NEAR-COMPLETE
DELOREAN BOO BIOENERGY INFRASTRUCTURE OWNERSHIP (STRATEGIC PIVOT)
IN CONSTRUCTION
SHOVEL READY
IN DEVELOPMENT
BIOENERGY PORTFOLIO
9x
UP TO FY2025 – EPC CONTRACTOR
NOW TRANSITIONING – BOO DEVELOPMENT
Delivering EPC projects for thirdparties, generating revenue on a
project-by-project basis
Establishing our High-Yielding Build-Own-Operate
project portfolio, locking in future revenue streams
and financing
FULL POTENTIAL
$500m+ portfolio of
commercially successful
bioenergy assets with
ongoing revenue streams
Delorean’s Mission is to build, own and operate (BOO) the largest portfolio of commercially successful renewable energy infrastructure in Australia and
New Zealand, measured by value of developed assets and quantity of renewable electricity, heat and renewable gas produced.
6
Delorean Corporation
Achievement Snapshot as at FY25
DELOREAN IS STRATEGICALLY INVESTING IN INFRASTRUCTURE AND PROJECT DEVELOPMENT
6
$30.0M
$80.0M
PROJECT DEVELOPMENT
4 PROJECTS COMPLETED
Invested to date on Balance sheet in
Delorean’s Project Development portfolio
Jandakot, Blue Lake Milling, Ecogas and
Yarra Valley Water construction value
$200
STRATEGIC PARTNERSHIPS
Partnerships with AGIG, ARENA, QLD
Govt., Brickworks, ATCO & Supagas
1,100TJs
5x
M
Portfolio Value
Grants Awarded $11.1M (subject to
conditions precedent)
CURRENT
DEVELOPMENT
PROJECTS
ACCU’s-80K+
RGGOs-1100K
Carbon Credits
$37.0M
9x
DEBT FUNDING SECURED
LONG-TERM PROJECTS
SAFE WORK HOURS
$32m For Delorean Owned SA1 Project
$500M+ Development Portfolio
Without lost time injury (LTI).
$50.0M+
GRANTS APPLIED
Green Gas p.a.
37,500Tpa
Biogenic CO₂
420K Tpa
120K Tpa
Waste Capacity
Biofertilizer Concentrate
70,000
7
Delorean Corporation
FY25 Achievements
PIVOT INTO INFRASTRUCTURE OWNERSHIP WITH CONSTRUCTION WELL UNDERWAY ON ITS SA1 FACILITY AND
CONSTRUCTION OF YARRA VALLEY WATER LILYDALE NEAR COMPLETION
✓
BUILD-OWNOPERATE
INFRASTRUCTURE
First BOO Project Underway: Construction commenced on SA1 Salisbury project with $37m corporate finance package & $6.1m ARENA Grant to
support large industrials. First gas and revenues expected in April 2026
✓
Strategic Partnerships Secured: Key strategic partnerships established with Tier 1 companies like Brickworks, AGIG, ATCO, Supagas, ARENA, QLD Govt.
and Feedstock providers
✓
DEL Project Portfolio Advanced: NSW1 Brickworks Development Approval granted, VIC1 Stanhope and broader BOO portfolio development continued
across Delorean’s national infrastructure pipeline, worth approximately $200 million
✓
MAJOR
CONTRACT
DELIVERED
Major Contract Success: $51m Yarra Valley Water (YVW) construction phase of project, Delorean’s largest Tier 1 contract, substantially completed
and profitable, delivering $50m in customer receipts to date and over 70,000 safe work hours without injury or lost time incidents (LTI’s). Project is
moving into initial 2.6 year operate and maintain contract worth circa $8m in revenue after the practical completion
✓
Long-Term Stability: Multi-year contracted O&M services to underpin continued plant performance
✓
Expanded Capabilities: Advisory and consultation services for third parties
✓
Operational Excellence and Risk Management: Achieved ISO 9001, 14001, 45001 accreditation, implemented standardized operations, enabling
consistent, scalable, and measurable project delivery across multiple concurrent projects
OPERATIONAL
EXCELLENCE
✓
Investment in Human Capabilities: Upskilled site teams through targeted HSE (Health, Safety, and Environment) training, boosting safety
performance, compliance, and operational efficiency. Key new Board appointments coupled with appointment of new CFO and COO
✓
Strategic Supply Chain Optimization: Forged key supplier partnerships to reduce costs, enhance procurement efficiency, and ensure quality
across all project lifecycles
8
Delorean Corporation
FY25 4E Financial Results Overview (unaudited)
REINVESTMENT OF EARNINGS INTO HIGH-YIELDING BUILD-OWN-OPERATE INFRASTRUCTURE ROLLOUT AND
OPERATION
FY25 Revenue
$19.8M
Group Earnings
($4.1)M
(Total Comprehensive Loss)
FY25 Cash Position
As at 30/6/2025
Project Development
Invested to date on Balance sheet in
Delorean’s Project Development portfolio
Yarra Valley Water Food Waste to Energy Project, VIC
Debt Funding
$30M drawn at 30/6/2025
FY25 marked Delorean’s successful pivot towards owning, building, and
operating renewable gas infrastructure. This next phase drives long -term,
multi-revenue growth, supported by investment -grade partners and
offtakers. Revenue continues to be underpinned by active projects and
consulting services.
$10.7M
$30.0M
$37.0M
Palisade Impact’s Convertible Notes and
Roadnight Capital loan were fully repaid
Grants Awarded
$50M+ Applied
$11.1M
9
Delorean Corporation
FY25 4E Financial Results Continued
BUILDING VALUE THROUGH STRATEGIC INVESTMENT IN CLEAN ENERGY ASSETS
KEY HIGHLIGHTS ($’000)
FY25
(unaudited)
FY24
CHANGE
COMMENTS
Receipts from Customers
25,910
29,549
Down 12%
Yarra Valley water project nearing completion
Revenue
- Infrastructure
- Construction
- Energy Retail
19,828
726
19,102
-
27,882
1,245
26,557
80
Down 29%
Yarra Valley Water project contributed the vast majority of the revenue.
Decrease was due to the delay in construction completion of the Yarra Valley
Water project and the consequential movement of revenue between financial
years and performance obligations in the contract. The project remains
profitable to date for both the construction phase and O&M phase to start in
FY26.
COS
(22,818)
(20,053)
Up 14%
Gross Profit
(2,990)
7,829
Down 138%
Reduction in profit recorded to date for Yarra Valley Water project, reduction
of all activity in Energy Retail segment and increased infrastructure overheads
for SA1 construction and transition to BOO model.
EBITDA
(6,302)
5,021
Down 226%
Increased overhead costs due to SA1 construction and transition year to BOO.
NPAT
(6,547)
4,771
Down 237%
Total comprehensive
(loss) / income
(4,146)
6,296
Down 166%
Cash Position
10,659
8,842
Up 21%
Increase in total cash whilst a decrease in guarantees for customers and
suppliers. Tanarra Facility C debt remains undrawn.
Total Assets
48,299
28,052
Up 72%
Significant increase due to the SA1 BOO project construction.
Increased costs in construction phase of Yarra Valley Water project as
construction completion draws near and O&M phase is prepared for.
$2.3 million increase in SA1 Land value (after tax), independent valuation.
10
Delorean Corporation
FY25 4E Financial Results Continued
KEY HIGHLIGHTS ($’000)
FY25
(unaudited)
FY24
CHANGE
Revenue (excl. other income &
interest income)
19,828
27,882
Down 29%
Delay in construction of Yarra Valley Water project and resources focused on
the engineering and construction of BOO projects which are non revenue
generating assets for FY25.
Statutory and underlying
EBITDA
(6,302)
5,021
Down 226%
Yarra Valley Water project construction completion delay as well as
construction cost increases causing reduction in recorded project profit to
date of $3.3m as at 30 June 2025. , in completion and starting, increased
overhead and capability to capture future demand in decarbonization in the
hard to abate sector.
Depreciation and amortisation
240
349
Down 31%
Statutory and underlying EBIT
(6,541)
4,672
Down 240%
238
1,242
Down 81%
Statutory and underlying net
profit after tax (NPAT)
(6,547)
4,771
Down 237%
Total comprehensive (loss) /
profit for the year
(4,146)
6,297
Down 166%
EBITDA margin
-32%
18%
Basic (loss) / earnings per share
(cents per share)
(2.99)
2.21
Net interest expense
COMMENTS
Repayment and refinance of loans and profitable cancelation of previous
convertible note.
$2.3 million increase in SA1 Land value (after tax), independent valuation
Down 235%
11
Delorean Corporation
Delorean’s Bioenergy Infrastructure Rollout
YVW Project Construction in FY25
Delorean Corporation
Delorean’s Portfolio
DELOREAN’S PROJECTS REPLACE NATURAL GAS WITH BIOMETHANE, DRIVING DECARBONISATION IN HARD-TO-ABATE
SECTORS THROUGH EXISTING INFRASTRUCTURE
Projected Biomethane Production from
Delorean Bioenergy Projects
3000
TERAJOULES (TJ)
2500
2000
1500
1000
500
IN CONSTRUCTION
0
FY2026
(SA, VIC)
FY2027
(SA, VIC, NSW,
QLD)
FY2028
(SA, VIC, NSW,
QLD, WA2)
FY2040
SA1
Bioenergy Plant
BIOMETHANE
13
Delorean Corporation
Delorean Infrastructure Rollout
DELOREAN IS ROLLING OUT HIGH-YIELDING (15%+ UNLEVERED IRR) INFRASTRUCTURE PROJECTS
Horizon
Project
Status
1
SA1 Bioenergy Project
AUD$42.8m
Under
construction
2
VIC1 Bioenergy Project
AUD$27.2m (Stage 1)
Shovel Ready
3
NSW1 Bioenergy Project In Development
DA Approved
AUD$65.0m (Stage 1)
4
QLD1 Bioenergy Project
AUD$39.6m
In Development
5
WA2 Bioenergy Project
AUD$25.0m
In Development
DEL Pipeline Projects
Planning
Short Term
Medium
Term
Long Term
9x
Jan 2025
June 2025
June 2026
June 2027
June 2028
ONGOING DEVELOPMENT
14
Delorean Corporation
Bioenergy Build-Own-Operate Project Revenue
DELOREAN’S COMMERCIAL SCALE ANAEROBIC DIGESTION PROJECTS DELIVER MULTIPLE DIVERSIFIED REVENUE
STREAMS WITH THE CERTAINTY OF LONG-TERM CONTRACTED OFFTAKES AND FEEDSTOCK SUPPLY
•
0.0%
Energy Offtake – 10+ year offtakes from investment grade
counterparties at a premium to wholesale gas prices.
12.9%
•
25.2%
credits
- Australian Carbon Credit Units (ACCU)
- Renewable Gas Guarantee of Origin (RGGO)
- Large Scale generation Certificates (LGC’s)
Energy Offtake
Green Revenue
Feedstock
Biofertiliser
43.6%
18.3%
Green Revenue – AD projects qualify for environmental
•
Feedstock - In pre-construction phase, typically up to 2-year
agreements for circa 50% of feedstock volumes are
contracted, rising to 100% contracted prior to commissioning.
CO2
•
Green CO2 - High demand for biogenic CO2, easy to secure
10+ year offtakes from investment grade counterparties.
•
Biofertiliser – further upside from biofertiliser sales
15
Delorean Corporation
BOO Project Funding Strategy
DELOREAN OPTIMISING DEBT-LED PROJECT FUNDING THROUGH STRATEGIC PROJECT-LEVEL FINANCE AND
REFINANCE SOLUTIONS FOR RAPID BOO EXPANSION
MULTIPLE PROJECTS 2 - N
PROJECT 1
SA1
•
18 months construction to commissioning
timeline limiting exposure to higher-cost debt
before refinancing with senior debt.
•
DEL’s project funding is supported by
significant State and Federal grants
(e.g., ARENA, QLD, NSW State Gov).
DEL Equity
& Land
15%
Grant
Corporate
Debt
Start: Dec 2024
DEL Equity
& Loan
15%
Grant
Grant /
Equity
Senior
Debt
Recycled
Debt
from SA1
Finish: Q1 CY2026
Construction
Significant value increase post-commissioning,
strengthening Delorean’s balance sheet and
providing headroom equity for senior debt
refinancing at the project level.
DEL Equity
& Land
DEL Equity
& Land
Asset Revaluation Post-Construction
SA1
Asset Revaluation Post-Construction
•
The core financing strategy involves a debt-led
financing stack during construction, followed
by refinancing with senior debt upon
commissioning, and future securitization of the
entire infrastructure portfolio.
Construction
•
Grant /
Equity
Senior
Debt
16
Delorean Corporation
Delorean’s Projects
SA1 Project Construction in FY25
Delorean Corporation
Track Record - Award-Winning AD Plants Built Across Australia/NZ
3 Award-Winning Bioenergy Projects Completed
COMMERCIAL &
INDUSTRIAL WASTE
AGRICULTURAL
WASTE
MUNICIPAL FOOD
WASTE
Jandakot
Bioenergy Plant
Blue Lake Milling
Bioenergy Plant
Ecogas (NZ)
Bioenergy Plant
18
Delorean Corporation – Selective EPC and O&M For Third Parties
YVW Bioenergy Plant
THIS FACILITY IS THE LARGEST FOOD WASTE TO ENERGY PLANTS OF ITS KIND IN AUSTRALIA
Yarra Valley Water (VIC)
PROJECT UPDATE (99% COMPLETE)
• All civil, structural, and equipment installation construction works
successfully completed.
• System testing finalised; commissioning phase currently underway.
• Over 70,000 man-hours completed with zero injuries or Lost Time
Incidents (LTI).
• ISO Quality and Safety audit conducted and successfully passed.
YVW Bioenergy Site Before
PROJECT BENEFITS
Location: Lilydale, Victoria
~$53m contract value, $6.5m O&M value
•
55,000tpa facility
•
39,000 KWh per day green energy production
•
Emissions reduction 24,700 (tCO2-e/annum)
• Decarbonize YVW energy consumption
• Combats climate change and resource depletion for water and energy
• Supplies energy to the Sewage Treatment Plant and Recycled Water Pump
Station, with surplus exported to the grid
• Recovers ~70% of liquid digestate as purified water
• Processes remaining solids and liquids for composting and agriculture
Jan 2024
Sep 2025
Sep 2025
Sep 2025
Sep 2025
Construction Start
First Waste
First Gas
Construction Finish
Operation & Maintenance
Renewable gas
generation
starts
Completion of
Delorean’s YVW
bioenergy project
Full Operation &
Maintenance
commence
Site Works of YVW
bioenergy project
begin
Feedstock
processing
starts
YVW Bioenergy Site Now
19
Delorean Corporation – BOO Infrastructure Rollout and Operation
SA1 Salisbury Bioenergy - First BOO Bioenergy Project in Australia
FIRST BIOENERGY FACILITY IN AUSTRALIA TO PRODUCE MAINS-GRADE BIOMETHANE AND BIOGENIC CO2
PROJECT UPDATE
SA1
• Major earthworks have been completed, and concrete pouring for the
tank farm and package equipment is underway.
• All major equipment has been ordered, with deliveries scheduled over
the coming months.
• The reception shed has arrived on-site, with construction set to begin
next month.
PROJECT BENEFITS
Green Gas-to-Mains Bioenergy Projects
Location: Salisbury, South Australia
•
70,000tpa facility (stage 1)
•
210 TJ/annum biomethane production
•
6,000tpa green CO2 – 10 year Supagas
Contract signed.
180 TJ pa
150,000 tCO2-e/annum
Industrial facility natural gas
replaced with biomethane
Project emissions reduction
(~3,700,000 tonnes over the
project lifetime)
200,000 tCO2e
Net Zero by 2040
Industrial customer emissions
reduction over project lifetime
Supporting large industrials in
decarbonizing
Sep 2024
Dec 2024
Dec 2024
Q3 FY26
Q4 FY26
Project Financing
Project FID
Construction Start
First Waste
First Gas
Construction Finish
Operation & Maintenance
Renewable gas
generation
starts
Completion of
Delorean’s SA1
bioenergy project
Full Operation &
Maintenance
commence
Tanarra $25m
corporate finance
package
Financial
Investment
Decision
Site Works of Delorean’s
SA1 bioenergy project
begin
Feedstock
processing
starts
Q4 FY26
Q4 FY26
20
Delorean Corporation – BOO Infrastructure Rollout and Operation
NSW1 Brickworks Bioenergy Plant - 1st BOO RNG Behind The Meter
AUSTRALIA’S FIRST INDUSTRIAL-SCALE BIOENERGY PROJECT TO CREATE RENEWABLE GAS BEHIND THE METER
PROJECT UPDATE
• Development Approval achieved
• The project is now progressing toward a final investment decision (FID), with a
focus on assessing project investment hurdles, securing long-form offtake
agreements, and negotiating joint venture and facility construction and operation
agreements.
• A FID is expected in 1HFY2026 by the board of directors of Brickworks and
Delorean. While the parties have agreed to continue working together on this
project, it is subject to Board approvals and binding legal documentation being
executed. There can be no assurance that this project will proceed.
NSW1
PROJECT BENEFITS
Green Gas Collaboration
Location: Horsley Park, NSW
•
120,000tpa facility (stage 1) with ability
for 150,000TPA
•
260-380 TJ/annum RNG generation
•
Development Approval Granted
H1 FY26
Project Financing
Corporate finance
package
138,035 tCO2-e/annum
325,300 tCO2e
Emissions reduction
Industrial facility emissions reduction over
project lifetime
253+ TJ/pa
~50% Scope 1 Emissions Reduction from
natural gas combustion
Industrial facility natural gas
replaced with biomethane
Supporting large industrials in decarbonizing
by replacing natural gas with biomethane
H1 FY26
H1 FY26
H2 FY27
H2 FY27
Project FID
Construction Start
First Waste
First Gas
Construction Finish
Operation & Maintenance
Renewable gas
generation
starts
Completion of
Delorean’s NSW1
bioenergy project
Full Operation &
Maintenance
commence
Financial
Investment
Decision
Site Works of Delorean’s
NSW1 bioenergy project
begin
Feedstock
processing
starts
H2 FY27
H2 FY27
21
Delorean Corporation – BOO Infrastructure Rollout and Operation
VIC1 Stanhope Bioenergy
THIS PROJECT WILL BE AMONG AUSTRALIA’S FIRST TO PRODUCE BIOMETHANE TO MAINS FROM ORGANIC WASTE
PROJECT UPDATE (PENDING FID)
VIC1
•
•
•
Green Gas-to-Mains Bioenergy Projects
Location: Stanhope, Victoria
•
•
•
•
54,000tpa facility (stage 1)
180 TJ/annum biomethane production
Emissions reduction 69,400 (tCO2-e/annum)
90% Delorean owned project
Approvals in place
The project is currently shovel ready for full construction pending
project finance.
Work activities completed to cover green gas connection for export
GREEN CERTIFICATES
• CER Registration for ACCUs under approved methodologies:
•
AWT Method- Diversion of organics from landfill
•
Animal Effluent Management Method
• GreenPower Registration for RGGOs
• Received a letter of support confirming the project alignment with the
certification
OFFTAKE AGREEMENTS
• Renewable Gas: Contract negotiations with large investment grade
counterparty at a premium to wholesale gas prices
FEEDSTOCK
• Feedstock secured across the project from multiple sources
H1 FY26
Project Financing
Corporate finance
package
H1 FY26
H1 FY26
H2 FY27
H2FY27
Project FID
Construction Start
First Waste
First Gas
Construction Finish
Operation & Maintenance
Renewable gas
generation
starts
Completion of
Delorean’s VIC1
bioenergy project
Full Operation &
Maintenance
commence
Financial
Investment
Decision
Site Works of Delorean’s
VIC1 bioenergy project
begin
Feedstock
processing
starts
H2 FY27
H2 FY27
22
Delorean Corporation
Delorean’s Sector Tailwinds and Look Forward
YVW Vioenergy Project
Delorean Corporation
Tailwinds: Urgent Demand for Biomethane
SCOPE 1 EMISSIONS REPORTING (NGERS) IS DRIVING AUSTRALIA’S DEMAND FOR BIOMETHANE
•
•
•
The Australian Government’s Future Gas Strategy recognises that natural gas will play a critical role in Australia’s future energy mix.
The Australian Energy Market Operator (AEMO) predicts almost no decline in gas use for industrial consumers through to 2043 as there are limited decarbonisation options available.
Australia has significant RNG production potential from unutilised feedstocks across a range of residues and wastes
AUSTRALIAN GAS CONSUMPTION
IN 2022-23
52%
26%
12%
9%
Source: Bioenergy Australia Unlocking Renewable Natural Gas to Enhance Energy S
Share your feedback