Investor Update
February 2026
Catalysing Australia’s Bioenergy Sector
www.deloreancorporation.com.au
ASX:DEL
Important Notice & Disclaimer
This document is confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This document is neither a prospectus nor an offer to subscribe for Shares. The purpose of this presentation is to provide general information
about Delorean Corporation Ltd (“Delorean” or the “Company”). This presentation is current as at 26 February 2026 (unless otherwise stated herein) and the information contained in it is in a summary form and does not purport to be complete. The
information in this presentation remains subject to change without notice. It is not recommended that any person makes any investment decision in relation to the Company based solely on this presentation.
This presentation does not necessarily contain all information which maybe material to the making of a decision in relation to the Company. Any investor should make their own independent assessment and determination as to the Company’s
prospects prior to making any investment decision and should not rely on the information in this presentation for that purpose.
This presentation does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold securities in the Company. The securities issued by the Company are considered speculative and there is no guarantee
that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. This presentation is not, and does not constitute, an offer to sell, or the solicitation,
invitation or recommendation of an offer to buy, any securities in any jurisdiction, including the United States, and neither this presentation, nor any of the information contained herein, shall form the basis of any contract or commitment. The
information in the presentation does not constitute an advertisement for an offer or proposed offer of securities and does not constitute a representation that an offering will occur. No person is authorised to give information or make any
representation that an offering will occur.
Any securities of Delorean have not been, and will not be, registered under the U.S. Securities Act or the securities laws of any state or other jurisdiction of the United States and, if there is an offer of securities, may not be offered or sold in the United
States except in transactions exempt from or not subject to, the registration requirements of the U.S.Securities Act and any other applicable securities laws.
This presentation is presented for informational purposes only. It is not intended to be, and is not, a prospectus, product disclosure statement, offering memorandum or private placement memorandum for the purpose of Chapter 6D of the Corporations
Act 2001.
Except for statutory liability which cannot be excluded, the Company, its officers, employees and advisers expressly disclaim any responsibility for, and make no representations or warranty for, the accuracy or completeness of the material contained in
this presentation and exclude all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. The Company
accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any obligation to furnish the person with any further information.
This presentation contains “forward-looking statements” and comments about future events, including statements about Delorean’s expectations about the performance of its business. Forward-looking statements may include words such as
“anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “out-look”, “upside”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”, and other similar expressions. Indications of, and guidance on, future earnings and financial position and
performance are also forward-looking statements. Forward-looking statements, opinions and estimates provided in this presentation are based on assumptions and contingencies which are subject to change without notice. Forward-looking statements
including projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied upon as an indication, prediction or guarantee of future performance. Actual results may differ materially from those
expressed or implied in such statements and these differences maybe material. The forward-looking statements in this presentation involve known and unknown risks and other factors, many of which are beyond the control of, or unknown to,
Delorean, its directors, officers and employees, and may involve significant elements of subjective judgement and assumptions as to future events which may or may not be correct.
Such forward looking statements are based on information available to Delorean as at the date of this presentation. Recipients are cautioned not to place undue reliance on forward looking statements and except as required by law or regulation,
Delorean assumes no liability to update these forward-looking statements. Such statements speak only as of the date hereof, and Delorean has no obligation to update or revise any such statements to reflect any change in events, conditions or
circumstances on which any such statement is based.
No representation or warranty, express or implied, is made by the Company that the matters stated in this presentation will be achieved or prove to be correct. Recipients of this presentation must make their own investigations and inquiries regarding
all assumptions, risks, uncertainties and contingencies which may affect the future operations of the Company or the Company’s securities.
The Company does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully consider whether the
securities issued by the Company are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position.
Disclaimer
2
Company Overview
Delorean is developing and building a network of assets across
Australia using mature in-vessel anaerobic digestion technology
to produce renewable gas, renewable electricity and biogenic
carbon dioxide from organic waste diverted from landfill.
Delorean has pioneered this sector in Australia and built a track
record delivering high-yielding projects helping to transform and
decarbonise Australia’s energy sector.
DIVERSIFIED INCOME – DELOREAN’S VERTICALLY INTEGRATED MODEL DERIVES INCOME FROM THREE SOURCES
ENGINEERING
• Engineering, Procurement, and Construction (EPC)
Contract Margins
• Operation & Maintenance (O&M) Contract Margins
• Sale of Renewable Natural Gas (Biomethane)
• Sale of Renewable Biogenic Liquid CO₂ (LCO2)
• Gate Fees for Acceptance of Organic Waste
• Sale of Liquid Fertilizer (future upside)
• Trading of Environmental Green Credits:
- Australian Carbon Credit Units (ACCUs),
- Renewable Gas Guarantees of Origin (RGGOs)
- Large-scale Generation Certificates (LGCs)
- Biogenic CO₂ certification (future upside)
• Future Energy Contracts
INFRASTRUCTURE ENERGY RETAIL
3
DELOREAN CORPORATION (ASX: DEL) IS
AUSTRALIA’S LEADING DEVELOPER OF
BIOENERGY INFRASTRUCTURE
Key Investment Highlights
4
✓ Delorean is the only Build-Own-Operate (BOO) Bioenergy developer in Australia with a strong track
record of delivering successful award-winning projects across ANZ
✓ Delorean is uniquely positioned to develop its strategic portfolio of BOO projects with significant
industry partners
✓ High margin business with contracted revenue flows – predictable and stable income once assets
are operational, underpinned by long-term contracts and attractive project economics
✓ Unique proposition on the ASX providing equity exposure to shovel ready waste and energy
infrastructure projects that demonstrate significant project-level IRRs
✓ Bioenergy industry has significant ‘green’ tailwinds driven by demand for renewable
energy production and waste diversion
✓ Use of organic waste to create gas enables sale of gas at a ‘green’ premium and at a
time of significant undersupply
Unique high yielding investment opportunity in the bioenergy sector
Long-term value upside
Attractive industry dynamics with strong growth potential
Project Financing and Capital
Strengthen the capital structure to enable long-term
growth through the structured deployment of debt,
equity, and strategic capital partnerships across priority
developments.
Earnings Growth and Profitability
Generate stable revenue and operating margins from
Delorean owned bioenergy infrastructure
DEL BOO Infrastructure Development
Build strategic partnerships and advance projects through
development, construction and operational phases.
Strategic Priorities
Delorean Corporation
1H FY2026 Highlights
Operational Highlights
7
WITH A TRACK RECORD AS A LEADING BIOENERGY EPC CONTRACTOR, DELOREAN IS
TRANSITIONING TO A BUILDER OWNER-OPERATOR, WITH 1 PROJECT WELL UNDER
CONSTRUCTION AND 6 OTHER PROJECTS VALUED AT OVER $200M, INCLUDING 2 SHOVEL-READY
✓ SA1 Salisbury: During the half year, Delorean continued to advance the construction of its flagship Build-Own-
Operate asset, with the aim of reaching waste acceptance and first gas in CY2026
✓ NSW1 Horsley Parks: Subsequent to the half year end, continued to actively explore pathways to potentially
progress the project into construction
✓ VIC1 Stanhope: Advancement of the development of the project, progressing preparations to reach construction
start in 2H FY2026
✓ Opal: Commencement of Opal funded feasibility study (valued at up to $2m), providing a foundation for future
bioenergy projects across Opal’s national operations
✓ DEL BOO Portfolio: Advancement of BOO infrastructure development portfolio across multiple projects
✓ Financing: Active engagement with debt financiers to progress near-term funding solutions for the BOO portfolio
High-Yielding Build-Own-Operate Infrastructure Rollout and Operation
Selective EPC and O&M For Third Parties
Corporate
✓ YVW Lilydale: Practical Completion on the $53 million construction of the Food Waste to Energy facility in Lilydale
and commenced Operations & Maintenance (O&M) phase, under a contract valued at approximately $8 million
over the initial two-and-a-half-year term
✓ Advisory and consultation services for third parties
✓ Operational excellence, risk management and investment in Human capabilities
✓ Furthered the development of relationships and partnerships with leading industrial, utility, and energy players
across Australia.
✓ Achieved Zero lost time incident rate (LTIR).
1H FY2026 Financial Results
8
DELOREAN IS BUILDING VALUE THROUGH STRATEGIC INVESTMENT IN CLEAN ENERGY ASSETS
1H FY26 Revenue
($0.7M)
1H FY26 Cash Position
$6.7M
1H FY26 Earnings
$4.8M
As at 31/12/2025
Adjusted EBITDA
Total Assets
As at 31/12/2025
$50.6M
Debt Funding Secured
Tanarra $35M of $37M drawn at 31/12/2025
NAB $0m of $14.5M drawn at 31/12/2025
$51.5M
Grants Applied $50M+
$11.1m secured, $2.7m received
in cash
1H FY2026 represents a foundational period in Delorean’s transition
from EPC contractor to infrastructure owner and operator.
The half year reflects the capital-intensive nature of developing and
constructing infrastructure assets ahead of commissioning and
operational revenue generation, with continued reinvestment into
capability, capital deployment and BOO platform development.
As Delorean expands its asset base and progresses development and
construction in its BOO portfolio, the Company is positioning itself to
deliver recurring, infrastructure-backed earnings from FY2027
onward.
Financials
KEY HIGHLIGHTS
($’000)
1HY26 2HY25 CHANGE
Receipts from
Customers
3,323 10,271 Down 68%
Revenue 6,702 7,223 Down 7%
COS (5,395) (12,952) Up 58%
Gross Profit 1,307 (5,729) Up 123%
EBITDA (946) (7,577) Up 197%
Total comprehensive
Income / (loss)
(1,450) (7,632) Up 238%
KEY HIGHLIGHTS
($’000)
December
2025
June 2025 CHANGE
Total Assets 50,622 46,415 Up 9%
Cash Position 4,850 10,659 Down 54%
Debt Position 36,417 29,902 Up 22%
Tax Losses 21,483 20,319 Up 6%
R&D refund/benefit
(lodged)
1,234 - -
9
BUILDING VALUE THROUGH STRATEGIC INVESTMENT IN CLEAN ENERGY ASSETS
Commentary
• Receipts from customers and revenue declined following practical
completion of ~$53M YVW construction part of contract,
reflecting the transition from construction activity to ongoing
O&M operations.
• EBITDA and profit improved from the previous half year but
declined from the comparable half year, with the Group reporting
a total comprehensive loss of $1.45M, reflecting the transition to
Build Own Operate and completion of YVW construction phase
and transition to lower total margins from YVW O&M operations.
• Total assets grew as construction advanced on the Delorean’s
first flagship BOO SA1 bioenergy plant.
• Cash position reduced and drawn debt increased following loan
drawdowns to fund construction of SA1.
• Tax losses increased during the half year, reflecting the reporting
loss.
• R&D tax benefit increased following lodgement of the non-
refundable tax offset for FY24 and estimated FY25 & FY26 benefit
is expected to rise, reflecting extensive R&D activities on
Delorean’s first BOO bioenergy plant.
Delorean’s Projects
SA1 Project Construction in FY25
Delorean’s Portfolio
11
0
500
1000
1500
2000
2500
3000
FY2027 FY2028 FY2029 FY2040
TERAJOULES
(TJ)
BIOMETHANE
Projected Biomethane Production from
Delorean Bioenergy Projects
DELOREAN’S PROJECTS REPLACE FOSSIL FUEL NATURAL GAS WHICH IS NON-RENEWABLE
WITH RENEWABLE BIOMETHANE, DECARBONISING HARD-TO-ABATE SECTORS THROUGH EXISTING INFRASTRUCTURE
Yarra Valley Water (VIC)
Current
• ~$53m construction contract value, initial $8m
O&M value
• One of the largest food waste to energy
facilities of its kind in Victoria to commercially
process mass organic waste.
• Construction Completed
• Operation and Maintenance ongoing
12
Selective EPC and O&M For Third Parties
Delorean Third Party Projects
SUCCESSFUL DELIVERY OF 4 INNOVATIVE AUSTRALASIAN BIOENERGY PROJECTS (3 AWARD-WINNING)
Ecogas (NZ)
Complete
• $10.1m contract value
• New Zealand’s first commercial scale
anaerobic digestion plant.
• Practical completion has been achieved.
• The facility is successfully accepting
organic waste and generating biogas.
• Delorean’s Ecogas project won the Low
Carbon Future Award at the New Zealand
Energy Excellence Awards.
Blue Lake Milling (SA)
Complete
• $7.6m contract value
• First facility in the world to process Ground
Oat Milled Fines (“GOMF”) for power
production on site, behind the meter.
• Plant continues to produce green electricity
and biofertiliser, providing BLM with all power
requirements, surplus electricity exported to
the grid.
• Delorean and BLM received a commendation
for this project in the SA Premier's Awards
(Energy and Mining (Environment) Category).
Richgro (WA)
Complete
• $9.5m contract value, flagship project.
• First facility of its kind in Australia to
commercially process mass organic waste
and to integrate with a composter.
• Payback on investment of less than 4 years,
ability to accept additional revenue from
gate fees (for feedstock).
• Electricity production equivalent to $400k
p.a.
Yarra Valley Water (VIC)
Location: Lilydale, Victoria
~$53m construction value, initial $8m O&M value
• 55,000tpa facility
• 39,000 KWh per day green energy production
• Emissions reduction 24,700 (tCO2-e/annum)
• Decarbonize YVW energy consumption
• Combats climate change and resource depletion for water and energy
• Supplies energy to the Sewage Treatment Plant and Recycled Water
Pump Station, with surplus exported to the grid
• Recovers ~70% of liquid digestate as purified water
• Processes remaining solids and liquids for composting and agriculture
13
PROJECT BENEFITS
PROJECT UPDATE
YVW Bioenergy Site
YVW Bioenergy Operations
Major Contract Success
• Practical Completion achieved in October 2025
• $8.0m initial 2.5-Year Operation & Maintenance phase ongoing,
delivering ongoing cashflow and long-term stability
• Over 70,000 man-hours completed with zero injuries or Lost Time
Incidents (LTI).
• ISO Quality and Safety audit conducted and successfully passed.
Selective EPC and O&M For Third Parties
YVW Bioenergy Plant
THIS FACILITY IS THE LARGEST FOOD WASTE TO ENERGY PLANT OF ITS KIND IN AUSTRALIA
Construction Start
Site Works of YVW
bioenergy project
begin
First Waste
Feedstock
processing
starts
First Gas
Renewable gas
generation
starts
Construction Finish
Completion of
Delorean’s YVW
bioenergy project
Sep 2025 Sep 2025 Sep 2025
Jan 2024
Operation & Maintenance
Operation & Maintenance
commence
Oct 2025
Selective EPC and O&M For Third Parties
YVW Bioenergy Plant Operations
14
SA1
Green Gas-to-Mains Bioenergy Projects
Location: Salisbury, South Australia
• 70,000tpa facility (stage 1)
• 210 TJ/annum biomethane production –
8+2 year Origin Contract signed
• 6,000tpa green CO2 – 10-year Supagas
Contract signed
Project FID
Financial
Investment
Decision
Project Financing
Tanarra $25m
corporate finance
package
Construction Start
Site Works of Delorean’s
SA1 bioenergy project
begin
First Waste
Feedstock
processing
starts
First Gas
Renewable gas
generation
starts
Construction Finish
Completion of
Delorean’s SA1
bioenergy project
CY 2026
Sep 2024 Dec 2024 Dec 2024
Operation & Maintenance
Full Operation &
Maintenance
commence
Delorean BOO Infrastructure Rollout and Operation
SA1 Salisbury Bioenergy - First BOO Bioenergy Project in Australia
150,000 tCO2-e/annum
Project emissions reduction
(~3,700,000 tonnes over the
project lifetime)
180 TJ pa
Industrial facility natural gas
replaced with biomethane
200,000 tCO2e
Industrial customer emissions
reduction over project lifetime
Net Zero by 2040
Supporting large industrials in
decarbonizing
15
CY 2026 CY 2026 CY 2026
•All major civil works are completed, including digestion tanks, the
main structure of the reception building and associated civil pads
• All equipment, including the site generator, biomethane upgrading
plant, pumps and heat exchangers moving through fabrication or
delivery
• ARENA Milestone 1 achieved with $2.7m in grant funding received
(GST exclusive). Milestone 2 application has been submitted
• R&D Tax refund claim in preparation
• First revenues and gas expected in CY2026
PROJECT UPDATE
PROJECT
BENEFITS
FIRST BIOENERGY FACILITY IN AUSTRALIA TO PRODUCE MAINS-GRADE BIOMETHANE AND BIOGENIC CO2
Delorean BOO Infrastructure Rollout and Operation
SA1 Salisbury Bioenergy - First BOO Bioenergy Project in Australia (cont.)
NSW1 QLD1
NSW1 Horsley Park Bioenergy will be Australia’s first
industrial-scale bioenergy project to create renewable
gas behind the meter
• 120,000tpa (full capacity)
• 260-380 TJ/annum RNG generation
• Emissions reduction of 138, 035 (tCO2-e/annum)
• Development Approval Granted
• Subsequent to the half year end, Delorean
continued to actively explore pathways to
potentially progress the project into construction
QLD1 Bioenergy will produce mains-grade biomethane
from processed commercial and industrial organic waste.
• 80,000tpa (stage 1)
• 265 TJ p.a. biomethane production
• Emissions reduction 161, 960 (tCO2-e/annum)
• $5m Queensland Government Grant in support of the
project approved
• Discussions are also underway with AGIG for mains gas
pipeline connection
Delorean BOO Infrastructure Rollout and Operation
Bioenergy Projects Under Development
VIC1
VIC1 Stanhope Bioenergy will be among Victoria’s first to
produce mains quality biomethane from organic waste.
• 54,000tpa facility (stage 1)
• 180 TJ/annum biomethane production
• Emissions reduction 69,400 (tCO2-e/annum)
• 90% Delorean owned project
• Approvals in place and shovel ready
• Green gas export connection scope completed
• Continued to advance the development of the
project, progressing preparations to bring it to Final
Investment Decision in 2H FY2026
THE COMPANY REMAINS ACTIVE IN DEVELOPING AND ARRANGING FINANCE FOR ITS OWN PIPELINE OF BIOENERGY
PROJECTS TO CAPITALISE ON THE GROWTH OF AUSTRALIAN BIOENERGY MARKET
18
• Strategic partnership with Opal, a leading Australian & New Zealand
recycling, paper and packaging manufacturer, to assess viability of
anaerobic digestion (AD) facilities at Opal’s Paper Mill in Victoria and
New South Wales.
• Opal-funded feasibility study (valued up to $2 million) to evaluate
commercial viability of an AD facility co-located at the Maryvale
Paper Mill through a staged development pathway.
• Potential 50/50 joint venture, with Delorean holding first right of
refusal for 50% equity following a successful feasibility study.
• Fully aligned with Delorean’s Build-Own-Operate (BOO) strategy,
supporting Opal’s Net Zero objectives and enabling long-term
recurring revenue streams.
BOO Infrastructure Rollout and Operation
Delorean Opal Strategic Collaboration
Agricultural
Waste
Municipal
Waste
4 Bioenergy Projects Constructed (3 Award-Winning), 1 Under Construction
Strong Track Record and Over 50 Years’ Collective Experience in
Delivering Award-Winning AD Plants Built Across Australia/NZ
Commercial &
Industrial Waste
Ecogas (NZ)
Richgro (WA) Blue Lake Milling (SA)
Yarra Valley Water (VIC) SA1 Salisbury (SA)
Delorean Corporation
Delorean’s Sector Tailwinds and Look Forward
YVW Vioenergy Project
CAPITAL SHIFT & INVESTOR PRESSURE
• Big 4 Bank support
• Government Grants
• ESG Investing
21
• Safeguard Mechanism
• Future Gas Strategy
• NSW Government’s Renewable Fuels Strategy
and Renewable Fuel Scheme
• NSW Government’s mandatory rollout of
FOGO by 2030
• Urgent Green Gas Demand
• Supply Shortage
• Price Premiums
Delorean’s high-yielding biomethane
projects are fully aligned with policy,
industry, and investor drivers—
delivering urgent green gas to meet
demand, support net-zero targets,
and unlock market opportunities.
IMPACT
POLICY PRESSURE
• National Climate Risk Assessment & National Adaptation Plan
• Climate Change (National Framework for Adaptation) Bill 2025
• National Greenhouse and Energy Reporting (NGER) Scheme
• Mandatory climate disclosures
• National Waste Policy Action Plan 2024
• Landfill Levy Increases
INDUSTRY TARGETS & NET ZERO
Strong Market Tailwinds for Biomethane of the past 18 Months
22
Planned Activity – 2H FY2026
High-Yielding Build-Own-Operate Infrastructure Rollout and Operation
Selective EPC and O&M For Third Parties
Operational Excellence & Drive Sustainability
• SA1 Salisbury: progress to completion of construction and commissioning of the SA1 BOO bioenergy
facility, with revenues expected in CY2026.
• VIC1 Stanhope: Secure funding for Delorean’s second shovel-ready project to take the project into
construction alongside SA1
• NSW1 Horsley Park: Continued to actively explore pathways to potentially progress the project to FID
and into construction
• Grant funding: Drawdown on Grant payment Milestones and conclude a portfolio of government grant
applications during FY2026 to further support Delorean’s BOO pipeline.
• BOO Development Portfolio: Progress the development of the Company’s QLD1, VIC2, NSW2 and WA2
projects.
• YVW: Multi-year contracted O&M revenues on its third-party Yarra Valley Water construction project
• Portfolio: Beyond the current near-term pipeline, Delorean will continue to assess selective third-party
construction opportunities that are complementary to its BOO strategy supporting large industrials
decarbonise in the hard to abate sector.
• Operational excellence and risk management to enable Delorean to scale for construction of its BOO
infrastructure portfolio.
• Support our partners’ delivery on ESG targets and carbon offset in the hard to abate large industrial sector
23
Contact
Joseph Oliver
Managing Director