Investor Update Presentation
Released
Released
Announcement PDF
Delorean Corporation Ltd
Investor Update
May 2026
www.deloreancorporation.com.au
Important Notice & Disclaimer
This document is confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This document is neither a prospectus nor an offer to subscribe for Shares. The purpose of this presentation is to provide general information
about Delorean Corporation Ltd (“Delorean” or the “Company”). This presentation is current as at 13 May 2026 (unless otherwise stated herein) and the information contained in it is in a summary form and does not purport to be complete. The
information in this presentation remains subject to change without notice. It is not recommended that any person makes any investment decision in relation to the Company based solely on this presentation.
This presentation does not necessarily contain all information which maybe material to the making of a decision in relation to the Company. Any investor should make their own independent assessment and determination as to the Company’s
prospects prior to making any investment decision and should not rely on the information in this presentation for that purpose.
This presentation does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold securities in the Company. The securities issued by the Company are considered speculative and there is no guarantee
that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. This presentation is not, and does not constitute, an offer to sell, or the solicitation,
invitation or recommendation of an offer to buy, any securities in any jurisdiction, including the United States, and neither this presentation, nor any of the information contained herein, shall form the basis of any contract or commitment. The
information in the presentation does not constitute an advertisement for an offer or proposed offer of securities and does not constitute a representation that an offering will occur. No person is authorised to give information or make any
representation that an offering will occur.
Any securities of Delorean have not been, and will not be, registered under the U.S. Securities Act or the securities laws of any state or other jurisdiction of the United States and, if there is an offer of securities, may not be offered or sold in the United
States except in transactions exempt from or not subject to, the registration requirements of the U.S. Securities Act and any other applicable securities laws.
This presentation is presented for informational purposes only. It is not intended to be, and is not, a prospectus, product disclosure statement, offering memorandum or private placement memorandum for the purpose of Chapter 6D of the
Corporations Act 2001.
Except for statutory liability which cannot be excluded, the Company, its officers, employees and advisers expressly disclaim any responsibility for, and make no representations or warranty for, the accuracy or completeness of the material contained in
this presentation and exclude all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. The Company
accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any obligation to furnish the person with any further information.
This presentation contains “forward-looking statements” and comments about future events, including statements about Delorean’s expectations about the performance of its business. Forward-looking statements may include words such as
“anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “out-look”, “upside”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”, and other similar expressions. Indications of, and guidance on, future earnings and financial position
and performance are also forward-looking statements. Forward-looking statements, opinions and estimates provided in this presentation are based on assumptions and contingencies which are subject to change without notice. Forward-looking
statements including projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied upon as an indication, prediction or guarantee of future performance. Actual results may differ materially from
those expressed or implied in such statements and these differences maybe material. The forward-looking statements in this presentation involve known and unknown risks and other factors, many of which are beyond the control of, or unknown to,
Delorean, its directors, officers and employees, and may involve significant elements of subjective judgement and assumptions as to future events which may or may not be correct.
Such forward looking statements are based on information available to Delorean as at the date of this presentation. Recipients are cautioned not to place undue reliance on forward looking statements and except as required by law or regulation,
Delorean assumes no liability to update these forward-looking statements. Such statements speak only as of the date hereof, and Delorean has no obligation to update or revise any such statements to reflect any change in events, conditions or
circumstances on which any such statement is based.
No representation or warranty, express or implied, is made by the Company that the matters stated in this presentation will be achieved or prove to be correct. Recipients of this presentation must make their own investigations and inquiries regarding
all assumptions, risks, uncertainties and contingencies which may affect the future operations of the Company or the Company’s securities.
The Company does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully consider whether the
securities issued by the Company are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position.
Delorean Corporation
Legal Disclaimer
2
Key Investor Events
3
19 May 2026
DEL Investor Webinar
Time: 12:30-1:00pm AEST
Registration:
https://investorhub.deloreancor
poration.com.au/webinars/Leo
wXe-del-investor-webinar
DELOREAN CORPORATION INVITES ALL EXISTING AND INTERESTED PARTIES TO JOIN UPCOMING DELOREAN INVESTOR EVENTS,
DESIGNED TO PROVIDE DEEPER INSIGHT INTO THE COMPANY’S BUILD-OWN-OPERATE BIOENERGY STRATEGY AND ASSET
PORTFOLIO
20 May 2026
DEL WA Sundowner
Time: 5:00-7:00pm AWST
Registration:
https://luma.com/0myau1xg
22 May 2026
DEL SA1 Salisbury Site Tour
Time: 12:30 – 1:30pm (Adelaide time)
Registration:
https://luma.com/immowmgo
25 May 2026
SPP Closing Date
Time: 5:00pm AWST
Applications:
https://portal.automic.com
.au/investor/home
Invest in Delorean’s Next Growth Chapter
DELOREAN CORPORATION LTD IS IN ITS NEXT PHASE OF GROWTH, TRANSITIONING FROM EPC CONTRACTOR INTO LONG-TERM
INFRASTRUCTURE OWNERSHIP THROUGH EXECUTION OF ITS SCALABLE HIGH-YIELDING BUILD-OWN-OPERATE PLATFORM IN
AUSTRALIA’S RAPIDLY EMERGING RENEWABLE GAS MARKET.
The Company is advancing financial close for its 100%-owned $62m NSW1 bioenergy facility, strategically co-located with Brickworks
manufacturing operations in Horsely Park, New South Wales, unlocking $30.5m in awarded Federal and State Government grants.
Delorean has successfully secured a strategic headco investment from an established Australian renewable gas producer with
decades of operational experience, further validating the Company’s strategy and asset quality, and strengthening its capital base.
With the Share Purchase Plan currently underway and NSW1 financial close targeted in the near term, Delorean is positioned to
commence construction of its next wholly owned renewable gas asset and accelerate the next phase of growth.
Delorean Investment Highlights
Unique and proven track record of delivering award-winning, innovative and successful Australasian bioenergy projects.
Strong pipeline of bioenergy projects under development to capitalise on the growth of Australian bioenergy market.
A leader in advancing Australia’s bioenergy sector and providing unique solutions to address especially hard to abate sectors.
Strong ESG credentials with TCFD and global ESG standards alignment, multiple ESG certifications, and formal sustainability reporting
Ideally positioned to capitalise on the national drive towards zero organic waste to landfill and decarbonisation of energy.
Investment Opportunity – DEL Share Purchase Plan
5
FOLLOWING THE RECENT $2.2M STRATEGIC PLACEMENT TO LMS ENERGY, DELOREAN CORPORATION INVITES ELIGIBLE
SHAREHOLDERS TO PARTICIPATE IN OUR SHARE PURCHASE PLAN (SPP), OFFERING AN OPPORTUNITY TO INVEST IN OUR
MISSION TO BUILD A CLEANER, MORE SECURE ENERGY FUTURE FOR AUSTRALIA AND NEW ZEALAND ON THE SAME TERMS AS
THE STRATEGIC INVESTMENT IN DELOREAN BY LMS ENERGY
Offer Structure and Size
Use of Funds
Proceeds from the Share Purchase Plan will support the next phase of
Delorean's Build-Own-Operate (BOO) growth strategy. This includes advancing
our nationally located renewable natural gas project portfolio toward
construction, including the NSW1 project, and strengthening the balance sheet
as SA1 progresses through its revenue ramp-up, and supporting general
working capital requirements.
Minimum investment
Maximum investment
$1,000
$30,000
Offer Opens
Offer Closes
4 May 2026
25 May 2026
Ranking Fully paid ordinary shares issued (“New Shares”) will rank equally in all
respects with Delorean’s existing ordinary shares from the date of their issue
Underwriting Share Purchase Plan is not underwritten
Online applications https://portal.automic.com.au/investor/home
Per share
$0.09M
Issue Price
To the latest closing price
per share on 28 April 2026
10%
Discount
$2.2M
SPP Target
Company Overview
Delorean is building a network of assets across Australia using
mature in-vessel anaerobic digestion technology to produce
renewable gas, renewable electricity and biogenic carbon dioxide
from organic waste diverted from landfill. Delorean has pioneered
this sector in Australia and built a track record delivering high-
yielding projects helping to transform and decarbonise Australia’s
energy sector.
DIVERSIFIED INCOME – DELOREAN’S VERTICALLY INTEGRATED MODEL DERIVES INCOME FROM THREE SOURCES
ENGINEERING
• Engineering, Procurement, and Construction (EPC)
Contract Margins
• Operation & Maintenance (O&M) Contract Margins
• Sale of Renewable Natural Gas (Biomethane)
• Sale of Renewable Biogenic Liquid CO₂ (LCO2)
• Gate Fees for Acceptance of Organic Waste
• Sale of Liquid Fertilizer (future upside)
• Trading of Environmental Green Credits:
- Australian Carbon Credit Units (ACCUs),
- Renewable Gas Guarantees of Origin (RGGOs)
- Large-scale Generation Certificates (LGCs)
- Biogenic CO₂ certification (future upside)
• Future Energy Contracts
INFRASTRUCTURE ENERGY RETAIL
6
DELOREAN CORPORATION (ASX: DEL) IS
AUSTRALIA’S LEADING DEVELOPER OF
BIOENERGY INFRASTRUCTURE
Investment Overview
7
UNIQUE INVESTMENT OPPORTUNITY IN THE BIOENERGY SECTOR
High quality portfolio of bioenergy
projects, including one in construction
and two which are ‘shovel ready’
Development pipeline will create a
diversified platform with scale
‘Early mover’ opportunity in the
emerging Australian bioenergy sector
Meaningful growth potential as
Australia accelerates the transition to a
circular economy
Size
(Shovel-Ready
Projects; Stage 1)
Waste processing capacity:
120,000t & 54,000t p.a.
Capex:
NSW1 ~$62.1m & VIC1 ~$35.7m
Location
(Shovel-Ready
Projects)
New South Wales
and
Victoria
Technology Anaerobic digestion
Development
pipeline
1 project nearing operation, 2
shovel-ready, 5 projects in
development &
8 longer-term projects
Diversification
Projects (including development
pipeline) located across 6 states,
processing organic waste, for
renewable gas and electricity, bio-
fertilser and Liquified CO2
ASX Code DEL
Ordinary Shares on Issue 244,678,153
Market Capitalisation
(8/5/2026)
$21,776,356
Board and Management
Hamish Jolly
Executive Chair &
Co-Founder
Surena Ho
Non-Executive Director
Steve Gostlow
Non-ExecutiveDirector
Joe Oliver
Managing Director &
Co-Founder
Jared Thomas
Non-ExecutiveDirector
DELOREAN’S BOARD COMPRISES A BALANCE OF STRONG
AND COMMITTED EXECUTIVE LEADERSHIP WITH DEEP
EXPERTISE IN BIOENERGY, WASTE, GAS, FINANCE, AND
ASX GOVERNANCE
Corporate Snapshot
Aidan Flynn
Chief Financial Officer &
Company Secretary
38.63%
9.97%
17.4%
34.0%
Shareholders
Founders LMS Energy Next Top 20 Retail (2,000 shareholders)
Founders
LMS Energy
Next Top 20
Retail
(2,000 shareholders)
Agricultural
Waste
Municipal
Waste
4 Bioenergy Projects Constructed (3 Award-Winning), 1 Under Construction
Commercial &
Industrial Waste
Ecogas (NZ)
Richgro (WA) Ag Residue Facility (SA)
Yarra Valley Water (VIC) SA1 Salisbury (SA)
Strong Track Record and Over 50 Years’ Collective Experience in
Delivering Award-Winning AD Plants Built Across Australia/NZ
Delorean’s Mission is to build, own and operate (BOO) the largest portfolio of commercially successful renewable energy infrastructure in Australia and
New Zealand, measured by value of developed assets and quantity of renewable electricity, heat and renewable gas produced.
OurStrategy
IN CONSTRUCTION
COMPLETED SHOVEL READY IN DEVELOPMENT
In O&M Contract
THIRD PARTY CONTRACTS (TRACK RECORD) DELOREAN BOO BIOENERGY INFRASTRUCTURE OWNERSHIP (STRATEGIC PIVOT)
Establishing our High-Yielding Build-Own-Operate
project portfolio, locking in future revenue streams
and financing
NOW TRANSITIONING – BOO DEVELOPMENT
$500m+ portfolio of
commercially successful
bioenergy assets with
ongoing revenue streams
FULL POTENTIAL
Delivering EPC projects for third-
parties, generating revenue on a
project-by-project basis
UP TO FY2025 – EPC CONTRACTOR
8x
BIOENERGY PORTFOLIO
10
WITH A TRACK RECORD OF DEVELOPING BIOENERGY INFRASTRUCTURE AS A LEADING BIOENERGY EPC CONTRACTOR,
DELOREAN IS TRANSFORMING INTO AN OWNER AND OPERATOR WITH 5 PROJECTS CURRENTLY IN THE PIPELINE
Pivot to Build-Own-Operate Clean Energy Infrastructure
A Scalable BOO Infrastructure Platform
̶ SA1 Salisbury - transitioning into operations
̶ NSW1 Horsley Park - ready for financial close and construction
̶ BOO Portfolio - 5 near-term projects in development
̶ Standardised BOO model - enabling efficient, repeatable
deployment across Australia
$200M+ Near-Term Renewable Gas Portfolio
̶ High-Yielding Projects – targeting 15%+
unlevered IRR’s
̶ Long-Term Contracted Offtake Agreements –
with strategic industrial partners
̶ Annuity-based cashflows from essential
renewable gas infrastructure assets
Multiple Diversified Revenue Streams
̶ Strong government grant and policy support
̶ Standardised BOO delivery model
̶ Increasing demand for industrial decarbonisation solutions
̶ Strategic co-location with large industrial energy users
̶ Expanding market for waste diversion and renewable gas
Scalable Growth Opportunity
38%
36%
0%
7%
19%
Renewable Natural Gas
Offtake
Feedstock
ACCUs
Biofertiliser
CO2
• Renewable Natural Gas Offtake - 10+ year offtakes from investment
grade counterparties at a premium to wholesale gas prices
- Renewable Gas Guarantee of Origin (RGGO)
• Feedstock - In pre-construction phase, typically up to 2-year
agreements for circa 50% of feedstock volumes are contracted,
rising to 100% contracted prior to commissioning
- Australian Carbon Credit Units (ACCU)
• Green CO2 - High demand for biogenic CO2, easy to secure 10+ year
offtakes from investment grade counterparties
• Biofertiliser - further upside from biofertiliser sales
12
Bioenergy Build-Own-Operate Project Revenue
DELOREAN’S COMMERCIAL SCALE ANAEROBIC DIGESTION PROJECTS DELIVER MULTIPLE DIVERSIFIED REVENUE
STREAMS WITH THE CERTAINTY OF LONG-TERM CONTRACTED OFFTAKES AND FEEDSTOCK SUPPLY ACHIEVEING
15%+ UNLEVERED IRR’s
Operations Yr1 Yr2 Yr3 Yr4
Revenue $10.1m $10.4m $11.0m $12.5m
Operating Costs $1.9m $2.0m $2.0m $2.1m
EBITDA $8.2m $8.4m $9.0m $10.4m
Operations Yr1 Yr2 Yr3 Yr4
Revenue $8.1m $8.6m $9.2m $10.6m
Operating Costs $1.8m $2.0m $2.0m $2.1m
EBITDA $6.2m $6.6m $7.2m $8.6m
Gate Fees
36%
Gas Export
Revenue
38%
CO2 Export
Revenue 19%
Biofertiliser
Income 0%
Green
Certificates 7%
Gate Fees
44%
Gas Export
Revenue
32%
CO2 Export
Revenue 16%
Biofertiliser
Income 2%
Green
Certificates…
BASE
CASE
UPSIDE
Delorean BOO Project – Indicative Target Economics
Assumptions
Feedstock Tonnes 70,000
Bio Methane productio 182TJ
CO2 production 6,127 T
ACCUs Created 14,000
Biofertiliser Tonnes 59,963
Gate Fees Low
Biofertiliser Income No
Assumptions
Feedstock Tonnes 70,000
Bio Methane productio 182TJ
CO2 production 6,127 T
ACCUs Created 14,000
Biofertiliser Tonnes 59,963
Gate Fees High
Biofertiliser Income Yes
Construction
EPCBuild Cost $41.2m
Dev. Costs Inc Land $7.0m
Total Project Cost $48.2m
Funding
Debt $14.5m
Equity $25.6m
Grants & R&D Credit $8.1m
Total Funding $48.2m
DELOREAN OPTIMISING DEBT-LED PROJECT FUNDING THROUGH STRATEGIC PROJECT-LEVEL FINANCE AND
REFINANCE SOLUTIONS FOR RAPID BOO EXPANSION
NSW1
$11.6m
DEL Equity
$20.0m
Project Debt
(similar to SA1)
$20.0m
NSW
Government
Grant
$10.5m
ARENA
Grant
Start: Q3 CY2026
Construction
Corporate
Debt
NSW1 HORSLEY PARK MULTIPLE PROJECTS 2 - N
DEL Equity
& Land
̶ The core financing strategy involves a debt-led
financing stack during construction, followed by
refinancing with senior debt upon commissioning,
and future securitization of the entire
infrastructure portfolio.
̶ Significant value increase post-commissioning,
strengthening Delorean’s balance sheet and
providing headroom equity for senior debt
refinancing at the project level.
̶ 18 months construction to commissioning timeline
limiting exposure to higher-cost debt before
refinancing with senior debt.
̶ DEL’s project funding is supported by significant
State and Federal grants (e.g., ARENA, QLD, NSW
State Gov).
̶ Delorean’s Equity Contribution is supported by
R&D tax refunds, working capital on hand, capital
raise and SPP
Asset
Revaluation
Post-Construction
Grant /
Equity
DEL BOO Project Funding Strategy
$10.5m
ARENA
Grant
Construction
Delorean’s Projects
AUSTRALIA'S FUTURE IN BIOENERGY & RENEWABLES
www.deloreancorporation.com.au ASX:DEL
Delorean’s Portfolio
16
0
500
1000
1500
2000
2500
3000
FY2027 FY2028 FY2029 FY2040
TERAJOULES
(TJ)
BIOMETHANE
Projected Biomethane Production from
Delorean Bioenergy Projects
DELOREAN’S PROJECTS REPLACE NATURAL GAS WITH BIOMETHANE, DRIVING DECARBONISATION IN HARD-TO-ABATE
SECTORS THROUGH EXISTING INFRASTRUCTURE
SA1
Green Gas-to-Mains Bioenergy Projects
Location: Salisbury, South Australia
• 70,000tpa facility (stage 1)
• 210 TJ/annum biomethane production –
8+2 year Origin Contract signed
• 6,000tpa green CO2 – 10-year Supagas
Contract signed
Project FID
Financial
Investment
Decision
Project Financing
Tanarra corporate
finance package
Construction Start
Site Works of Delorean’s
SA1 bioenergy project
begin
First Waste
Feedstock
processing
starts
First Gas
Renewable gas
generation
starts
Construction Finish
Completion of
Delorean’s SA1
bioenergy project
CY 2026
CY 2024 CY 2024 CY 2024
Operation & Maintenance
Full Operations &
Maintenance
commence
Delorean BOO Infrastructure Rollout and Operation
SA1 Salisbury Bioenergy - First BOO Bioenergy Project in Australia
150,000 tCO2-e/annum
Project emissions reduction
(~3,700,000 tonnes over the
project lifetime)
180 TJ pa
Industrial facility natural gas
replaced with biomethane
200,000 tCO2e
Industrial customer emissions
reduction over project lifetime
Net Zero by 2040
Supporting large industrials in
decarbonizing
17
CY 2026 CY 2026 CY 2026
• All major civil works are completed, including digestion tanks, the main
structure of the reception building and associated civil pads
• All equipment, including the site generator, biomethane upgrading
plant, pumps and heat exchangers moving through fabrication or delivery
• $3.80M received to date from the $6.08M ARENA grant (ex GST).
• R&D Tax refund claim lodged
• First revenues and gas expected in Q3 CY2026
PROJECT UPDATE
PROJECT
BENEFITS
FIRST BIOENERGY FACILITY IN AUSTRALIA TO PRODUCE MAINS-GRADE BIOMETHANE AND BIOGENIC CO2
NSW1 Horsley Park
Delorean BOO Infrastructure Rollout and Operation
Horsley Park Bioenergy $30.5m grants - 1st RNG Behind The Meter
325,300 tCO2e
Industrial facility emissions
reduction over project lifetime
138,035 tCO2-e/annum
Emissions reduction
253+ TJ/pa
Industrial facility natural gas
replaced with biomethane
~50.5% Scope 1 Emissions
Reduction for Brickworks
site from natural gas
combustion
Supporting large industrials in
decarbonizing
18
• $30.5m Grants secured
• Final Investment Decision announced on 8 April 2026
• 100% owned
• 25- year lease and biomethane offtake agreement with Brickworks
• Development Approval achieved
• Construction is anticipated to commence Q3 CY2026
PROJECT UPDATE
PROJECT
BENEFITS
AUSTRALIA’S FIRST INDUSTRIAL-SCALE BIOENERGY PROJECT TO CREATE RENEWABLE GAS BEHIND THE METER
Location: Horsley Park, NSW
• Capex: $62.1m (offset by $30.5m of grants)
• 120,000tpa facility (stage 1) with ability for
150,000TPA
• 253-380 TJ/annum Renewable Natural Gas
generation
• Located on Brickworks land under a 25-year
lease agreement with an offtake for
biomethane to Brickworks
Project FID
Financial
Investment
Decision
Project Financing
Corporate finance
package
Construction Start
Site Works of Delorean’s
NSW1 bioenergy project
begin
First Waste
Feedstock
processing
starts
First Gas
Renewable gas
generation
starts
Construction Finish
Completion of
Delorean’s NSW1
bioenergy project
Operation & Maintenance
Full Operation &
Maintenance
commence
1H CY26 Q2 CY28 Q2 CY28 2H CY28 2H CY28
1H CY26 Q3 CY26
VIC2 - Opal Partnership
QLD1
QLD1 Bioenergy will produce mains-grade biomethane
from processed commercial and industrial organic waste.
• 80,000tpa (stage 1)
• 265 TJ p.a. biomethane production
• Emissions reduction 161,960 (tCO2-e/annum)
• $5m Queensland Government Grant in support of the
project approved
• Discussions are also underway with AGIG for mains gas
pipeline connection
Delorean BOO Infrastructure Rollout and Operation
Additional Bioenergy Projects Under Development
VIC1
VIC1 Stanhope Bioenergy will be among Victoria’s first to
produce mains quality biomethane from organic waste.
• 54,000tpa facility (stage 1)
• 180 TJ/annum biomethane production
• Emissions reduction 69,400 (tCO2-e/annum)
• 90% Delorean owned project
• Approvals and site in place and shovel ready
• Green gas export connection scope completed
• Continued to advance the development of the
project, progressing preparations to bring it to Final
Investment Decision in CY2026
THE COMPANY REMAINS ACTIVE IN DEVELOPING AND ARRANGING FINANCE FOR ITS OWN PIPELINE OF BIOENERGY
PROJECTS TO CAPITALISE ON THE GROWTH OF AUSTRALIAN BIOENERGY MARKET
Strategic partnership with Opal, a leading Australian & New Zealand
recycling, paper and packaging manufacturer, to assess viability of
anaerobic digestion (AD) facilities at Opal’s Paper Mills
• Opal-funded feasibility study (valued up to $2 million) to
evaluate commercial viability of an AD facility co-located at the
Maryvale Paper Mill through a staged development pathway.
• Potential 50/50 joint venture, with Delorean holding first right of
refusal for 50% equity following a successful feasibility study.
• Fully aligned with Delorean’s Build-Own-Operate (BOO) strategy,
supporting Opal’s Net Zero objectives and enabling long-term
recurring revenue streams.
Delorean’s Sector Tailwinds and Look Forward
YVW Vioenergy Project
DELOREAN’S HIGH-YIELDING
BIOMETHANE PROJECTS ARE FULLY
ALIGNED WITH POLICY, INDUSTRY,
AND INVESTOR DRIVERS –
DELIVERING URGENT GREEN GAS
TO MEET DEMAND, SUPPORT NET-
ZERO TARGETS, AND UNLOCK
MARKET OPPORTUNITIES
CAPITAL SHIFT & INVESTOR PRESSURE
• Big 4 Bank support
• Government Grants
• ESG Investing
21
• Safeguard Mechanism
• Future Gas Strategy
• NSW Government’s Renewable Fuels Strategy
and Renewable Fuel Scheme
• NSW Government’s mandatory rollout of
FOGO by 2030
• Urgent Green Gas Demand
• Supply Shortage
• Price Premiums
IMPACT
POLICY PRESSURE
• National Climate Risk Assessment & National Adaptation Plan
• Climate Change (National Framework for Adaptation) Bill 2025
• National Greenhouse and Energy Reporting (NGER) Scheme
• Mandatory climate disclosures
• National Waste Policy Action Plan 2024
• Landfill Levy Increases
INDUSTRY TARGETS & NET ZERO
Strong Market Tailwinds for Biomethane of the past 18 Months
• SA1 Salisbury: Completion and commissioning of the SA1 Salisbury bioenergy facility, with revenues
expected from 2H CY2026
• NSW1: Construction targeted to start in 2H CY2026, with revenues expected from 1H CY2028
• VIC1: Shovel ready and project construction targeted to commence in CY2026
• BOO Portfolio: The Company intends to adopt a similar approach to the above projects across the BOO
portfolio, locking in multi-year revenues from organic waste acceptance, and sale of renewable gas,
green electricity, CO2 and environmental credits to underpin capital recycling and debt refinance with
major banks
• Grant Funding: Drawdown on grant payment milestones and conclude a portfolio of government grant
applications during FY2026 to further support Delorean’s BOO pipeline
22
Look Forward
SELECTIVE EPC AND O&M FOR THIRD PARTIES
OPERATIONAL EXCELLENCE & DRIVE SUSTAINABILITY
• YVW: Multi-year contracted O&M revenues on its third-party Yarra Valley Water construction project
• Portfolio: Beyond the current near-term pipeline, Delorean will continue to assess selective third-party
construction opportunities that are complementary to its BOO strategy supporting large industrials
decarbonise in the hard to abate sector
• Continue operational excellence and risk management program to enable Delorean to scale the
construction of its BOO infrastructure portfolio
• Support our partners’ delivery on ESG targets and carbon offset in the hard to abate large industrial sector
HIGH YIELDING BUILD-OWN-OPERATE INFRASTRUCTURE ROLLOUT AND OPERATION
23
Australia cannot reach Net Zero without
Renewable Gas – Biomethane is Commercially
Ready Now, Proven Globally, and Ready to Scale
Delorean Corporation
Contact
www.deloreancorporation.com.au
Joseph Oliver
Managing Director
Ground Floor, 1205 Hay Street
West Perth WA 6005
T (08) 6147 7575
info@deloreancorporation.com.au
Aidan Flynn
CFO
Ground Floor, 1205 Hay Street
West Perth WA 6005
T (08) 6147 7575
info@deloreancorporation.com.au
Share your feedback
Discover