31 December 2024 Appendix 4D and Interim Financial Report
Released
Released
Announcement PDF
Australia’s future in bioenergy and renewables
Interim Financial Report
for the half-year ended
31 December 2024
Delorean Corporation Limited
ACN 638 111 127
Image 1: YVW Food Waste to Energy Project
Vision Statement
To be recognised as Australia and New Zealand’s leading emerging
renewable energy generator and retailer, led by its fast-growing
bioenergy infrastructure footprint.
Mission Statement
To build, own and operate the largest portfolio of commercially
successful renewable energy infrastructure in Australia and New Zealand,
measured by value of developed assets and quantity
of renewable electricity, heat and gas produced.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
2
Table Of Contents
Appendix 4D .................................................................................................................................................... 4
Corporate Directory ........................................................................................................................................ 6
Half-year ended 31 December 2024 at a glance ............................................................................................. 7
Directors’ Report ........................................................................................................................................... 11
Auditor’s Independence Declaration ............................................................................................................ 25
Consolidated Statement of Profit or Loss and Other Comprehensive Income ............................................. 26
Consolidated Statement of Financial Position .............................................................................................. 27
Consolidated Statement of Changes in Equity .............................................................................................. 28
Consolidated Statement of Changes in Equity (continued) .......................................................................... 29
Consolidated Statement of Cash Flows......................................................................................................... 30
Notes to the Consolidated Financial Statements.......................................................................................... 31
Directors’ Declaration ................................................................................................................................... 45
Independent Auditor’s Review Report.......................................................................................................... 46
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
3
Appendix 4D
1. Company details
Name of entity:
ABN:
Reporting period:
Previous period:
Delorean Corporation Limited
62 638 111 127
For the half-year ended 31 December 2024
For the half-year ended 31 December 2023
2. Results for announcement to the market
Revenues from ordinary activities
up
87% to
12,300,397
Profit from ordinary activities after tax attributable to
the owners of Delorean Corporation Limited
up
97% to
978,005
Profit for the half-year attributable to the owners of
Delorean Corporation Limited
97% to
978,005
up
Comments
The profit for the consolidated entity after providing for income tax and non-controlling interest
amounted to $978,005 (31 December 2023: Profit $495,563).
Refer to the Review of Operations section included within the Directors’ Report of the attached Financial
Report for the half-year ended 31 December 2024.
3. Net tangible assets
Reporting
period
Cents
Net tangible assets per ordinary security
5.64
Previous
period
Cents
1.96
4. Control gained over entities
Not applicable.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
4
5. Loss of control over entities
Not applicable.
6. Details of associates and joint venture entities
Not applicable.
7. Audit qualification or review
Details of review dispute or qualification (if any):
The financial statements were subject to a review by the auditors and the review report is attached as
part of the Interim Financial Report.
8. Attachments
Details of attachments (if any):
The Interim Financial Report of Delorean Corporation Limited for the half-year ended 31 December 2024
is attached.
9. Signed
Hamish Jolly
Executive Chairman
27 February 2025
Perth, Western Australia
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
5
Corporate Directory
Directors
Mr Hamish Jolly
Mr Joseph Oliver
Mr David McArthur
Mr Steve Gostlow
Mr Michael Phillip
ASX Code
Shares: DEL
Company Secretary
Mr David McArthur
Country of Incorporation and Domicile
Australia
Legal Form of Entity
Public Company
Contact Details
deloreancorporation.com.au
info@deloreancorporation.com.au
+61 8 6147 7575
Registered and Principal Office
Ground Floor
1205 Hay Street
WEST PERTH WA 6005
Postal Address
Ground Floor
1205 Hay Street
WEST PERTH WA 6005
Auditors
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
PERTH WA 6000
Bank
Commonwealth Bank of Australia
Level 14B, 300 Murray Street
Perth WA 6000
Share Registry
Automic Group
Level 5, 191 St Georges Terrace
PERTH WA 6000
Telephone: 1300 288 664
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
6
Half-year ended 31 December 2024 at a glance
Financial Highlights
Group Revenue for 1H FY2025 was $12.3m (excluding R&D tax offset and other income).
EBITDA: In 1H FY2025, Delorean realised an Adjusted EBITDA profit of $1.4m.
Cash balance of $15.3m as at 31 December 2024, comprising $3.5m in term deposits supporting cashbacked prudential and contract bonds and $11.8m in available cash for working capital.
Grants applied: $40m with $5M secured and rest pending
Corporate: Secured $30m corporate finance facility with Tanarra Restructuring Partners to facilitate
early redemption of Palisade Impact’s Convertible Notes in full and to support the start of construction
and order of long lead items of the SA1 Project.
Operational Highlights
Infrastructure Division:
Focused on High-Yielding Build-Own-Operate Infrastructure Rollout
Projects in Development: 4 projects valued at over $100 million, subject to funding and FID
SA1 Project: During the half year, Delorean reached internal FID with $25m of the Tanarra facility
assigned to this project, mobilised the site and the key project team, procured the majority of the long
lead items from our approved key suppliers, with the aim of reaching waste acceptance by Q2 FY2026
and First Gas by Q3 FY2026.
Brickworks/NSW1 Project: The ongoing co-development of the NSW1 project, in a landmark
collaboration with Brickworks Building Products, continues to progress. The public exhibition phase
for development approval has been completed, with public submissions received and responses being
finalised. The parties are actively working to set the timeline and path to FID for the project expected
late Q4 FY2025. The plant will supply renewable gas to Brickworks’ manufacturing operations, with
the further intent to roll out plants at Brickworks sites nationally.
Projects Funding: Actively engaged with a shortlist of potential debt funders with the objective of
securing funding (circa $30m) for Delorean’s second shovel-ready project, the VIC1 project, to take
the project into construction alongside SA1.
Development Portfolio: Advanced the Company’s Infrastructure Development Portfolio, including the
QLD1 and WA2 Projects.
Engineering Division:
Focused on EPC & O&M for Third Parties
Yarra Valley Water: In H1 FY2025, construction works continued on the $53m Yarra Valley Water,
food waste to energy project with tank construction complete on the inlet and outlet tanks and the
digesters, Reception Building underway and the delivery of major plant and equipment items on site
and placed ready for mechanical and electrical connection, after the completion of the major civil
works on site.
O&M: Operational support ongoing for Blue Lake Milling and Ecogas Bioenergy facilities previously
constructed by Delorean.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
7
Corporate:
Business improvements through strengthened leadership, with a focus on cash flow and profitability.
Furthered the development of relationships and partnerships with leading industrial, utility, and
energy players across Australia.
Achieved Zero lost time incident rate (LTIR).
Advanced the Company’s ESG Strategy.
Successfully refinanced existing convertible notes with Palisade Impact, fully settling Delorean's
liabilities and discharging all associated securities.
The Company settled its historical loan with Roadnight Capital in full.
Company Highlights
✓ Delorean is a profitable business with a strong revenue growth profile – a business that has demonstrated
its ability to deliver award winning projects nationally and overseas.
✓ Delorean has the right team to execute – the management team brings over 50 years of combined
experience in the bioenergy industry. With strong industry connections and credibility, the team is well
positioned to drive successful project execution.
✓ Delorean’s position in the market is unique – the Company has a mixture of EPC and O&M revenue streams,
combined with build-own-operate projects both under construction and ready to commence, with a large
portfolio of development projects in strategic locations.
With a firm foothold in the renewable energy landscape and a strong commitment to driving positive change,
Delorean Corporation is incredibly well placed to capitalise on the major and long-term structural shift in gas
demand. Our steadfast commitment to advancing sustainable solutions and expanding our portfolio
exemplifies our purpose of shaping a cleaner future for Australia and New Zealand.
Image 2: Delorean Corporation SA1 Bioenergy Site
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
8
Chairman’s Address
“Delorean has had a great start to the FY2025 financial year, posting revenues for
the half year up 87% and profit after tax up 97% on 1H FY2024.
After the transformational events of FY2024, in the first half of this financial year
the company is now in a substantial growth phase. Our base Engineering,
Procurement, and Construction (EPC) business is delivering earnings while
Delorean is now actively in construction for the rollout of our Build-Own-Operate
(BOO) bioenergy projects.
At a key inflexion point in September 2024, Delorean secured a partnership with
Tanarra to finance the construction of the SA1 project in Adelaide, kickstarting
Delorean’s BOO portfolio. SA1 construction commenced in December 2024 and
first gas expected in Q3 FY2026.
Our business strategy is to fast-track Delorean’s transition into a bioenergy infrastructure owner and operator,
delivering predictable annuity-based income streams from high-yielding assets and layering up earnings for
each BOO project we build and bring onstream.
As these facilities become operational, they will generate revenues from fees for acceptance of organic waste
streams and from sale of renewable green energy, and environmental credits. Delorean is continuing to
explore additional revenue streams, including the sale of natural byproducts such as biofertiliser and
commercial-scale carbon dioxide products for further upside.
Delorean has $40m in Federal and State grant applications on foot in support of construction of this
infrastructure portfolio.
In the first half of FY2025 year, Delorean’s base EPC business continued to perform strongly with Delorean
well advanced in EPC construction of Yarra Valley Water’s second bioenergy facility ($53m) in Lilydale, Victoria.
Completion of construction is scheduled for May 2025 - delivering revenues through FY2025 and benefiting
from follow-on O&M revenues post-commissioning. These augment O&M revenues from the Ecogas project
completed in New Zealand in FY2024.
Our focus for the second half of FY2025 is to lock in further revenue streams for the SA1 project while
progressing construction on time/on budget, towards bringing earnings onstream from that project in FY2026.
Beyond SA1, Delorean is focused on reaching FID on its shovel ready project in Victoria, VIC1 by Q4FY25,
working with a short list of debt funders to support Delorean’s project pipeline and national roll out of organic
waste to energy infrastructure.
Delorean continues its collaborative development of the NSW1 BOO bioenergy project under agreements with
Brickworks, with planning approval submissions made in 1H FY2025 and advanced commercial discussions
with Brickworks with regards to structuring the joint venture. The project is expected to progress to Financial
Investment Decision (subject to normal investment and funding parameters) with Delorean commencing
construction in early FY2026.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
9
Delorean also remains active in the development of its QLD1 BOO project, for which it successfully secured
grant funding with the support of the Queensland Government (announced on 28 February 2024), and is
subject to planning approvals and FID expected later in 2025.
Now funded to kick off construction of our high-yielding BOO project rollout, the prospects for Delorean are
extremely good. Delorean is a profitable, high-growth company with a track record in the two high-growth
sectors of waste management and renewable energy (including renewable gas).
We look forward to providing further positive updates and announcements in the second half of FY2025.
Yours sincerely,
Hamish Jolly
Executive Chair & Co-Founder
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
10
Directors’ Report
The Directors present their report together with the financial statements of Delorean Corporation Limited
(“Delorean” or “the Company” or “DEL”) and its subsidiaries (“the Consolidated Entity”) for the half year ended
31 December 2024 and the auditor’s report thereon.
Our Board
Delorean’s Board comprises a balance of strong and committed executive leadership through its Co-founders,
Executive Chair Hamish Jolly and Managing Director Joseph Oliver, matched with Steve Gostlow’s deep
experience and company growth track record in the Australian waste sector with Tox Free Solutions Ltd, David
McArthur’s decades of experience in the complexities of ASX-listed businesses, and Michael Phillip’s extensive
finance and investing background across various industries and continents. The Board functions well with the
Non-Executive Directors providing guidance on finance, performance management and M&A strategy.
Together, the Directors hold 43.38% of DEL’s issued capital and are motivated to guide the Company to meet
its growth and profitability targets and realise the Company’s vision.
Strong Leadership
Hamish Jolly
Executive Chair & Co-Founder
Hamish is a seasoned executive and holds a Bachelor of Business (Business Law and Accounting) and is a Member
of the Institute of Chartered Accountants in Australia and New Zealand. He is a former Director of Strategy and
Ventures at Bankwest, and former CEO of Greening Australia, one of Australia’s largest environmental NGO’s.
Joseph Oliver
Managing Director & Co-Founder
Joe has over 15 years’ experience in engineering, power generation and renewable energy across both
Australasia and Europe. Prior to Delorean, Joe worked for Edina Ltd, specialising in power generation. Joe has
been involved in developing the UK Anaerobic Digestion sector, delivering over 10 facilities nationwide through
both Farmgen Ltd and Monsal Ltd.
Steve Gostlow
Non-Executive Director
Steve has over 20 years’ experience in the waste management industry. He was Managing Director of Tox Free
Solutions Ltd (Toxfree) for 16 years where he developed Toxfree into one of Australia’s largest waste
management companies. Steve has formal governance qualifications as a Graduate of the Australian Institute of
Company Directors.
David McArthur
Non-Executive Director & Company Secretary
David is a Chartered Accountant, with over 30 years’ experience. He is currently a director of Lodestar Minerals
Ltd (ASX: LSR) and has served on the boards of several listed companies, including Xstate Resources Ltd
(ASX:XST), Australian Oil Company Ltd (ASX: AOK), and Harvest Technology Ltd (ASX:HTC). Additionally, he was
also Chair of the Audit and Risk Management Committee for all four.
Michael Phillip
Non-Executive Director
Michael has over 25 years of financial markets experience. He has an extensive finance and credit investing
background across various industries and continents. Michael holds a Master of Business Administration form
the University of California at Berkeley and Bachelor of Engineering in Chemical Engineering from the University
of Sydney. He is the founding Chief Investment Officer of Tanarra Capital’s special situations division.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
11
Directors’ Report (continued)
Operating and Financial Review
Principal Activities
Delorean is a leading builder and developer of bioenergy infrastructure throughout Australia. The principal
activities of the Consolidated Entity during the financial year were:
Renewable energy asset investment
Development
Construction
Tank and infrastructure fabrication
Key Investment Highlights
Unique high yielding investment opportunity in the bioenergy sector
Delorean is the only Build-Own-Operate (BOO) Bioenergy developer in Australia with a strong track record
of delivering successful award-winning projects across ANZ
Delorean is uniquely positioned to develop its strategic portfolio of BOO projects with significant industry
partners
Long-term value upside
High margin business with contracted revenue flows – predictable and stable income once assets are
operational, underpinned by long-term contracts and attractive project economics
Unique proposition on the ASX providing equity exposure to shovel ready waste and energy infrastructure
projects that demonstrate significant project-level IRRs
Attractive industry dynamics with strong growth potential
Bioenergy industry has significant ‘green’ tailwinds driven by demand for renewable energy production and
waste diversion
Use of organic waste to create gas enables sale of gas at a ‘green’ premium and at a time of significant
undersupply
Strategy
The core focus of the business is to develop, construct, own and operate bioenergy infrastructure in Australia.
Revenue is generated through the acceptance of organic waste and agricultural residues, the generation of
renewable electricity, the production of renewable natural gas and biogenic CO2.
In addition, Delorean currently constructs bioenergy projects for third parties in Australia and New Zealand
and maintains licenses for the retailing of electricity and gas. The Company’s energy retail activities are
confined to the monetisation of energy exclusively from the bioenergy assets constructed or developed,
owned and operated by Delorean.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
12
Directors’ Report (continued)
Operating and Financial Review (continued)
Vertically Integrated Renewable Energy Business
The business comprises three interoperable divisions:
Project Portfolio
The following graphic sets out an overview of Delorean projects, completed, under construction, under
development and in the pipeline.
Image 3: Delorean Corporation Projects across Australia and New Zealand
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
13
Directors’ Report (continued)
Operating and Financial Review (continued)
Overview
Delorean Corporation’s activities in the half year ending December 2024 continued to support and refine the
Company’s strategic direction and ongoing growth. Delorean is committed to shaping a cleaner energy future
through its vertically integrated renewable energy model.
During the first half of FY2025, Delorean commenced construction of its first Build, Own, Operate project –
SA1 – via a corporate financing facility from Tanarra, and continued construction of Yarra Valley Water’s (YVW)
second bioenergy project, being the largest in Australia and Delorean’s fourth major project.
Delorean reported a growth in profit and revenue and is active in bringing its next four build/own/operate
bioenergy infrastructure projects to FID together worth over $100m.
Delorean Engineering Division
Delorean’s Engineering Division delivers engineering design, construction and operation/maintenance services
for third parties under contract, and for Delorean Infrastructure Division’s build/own/operate projects.
Yarra Valley Water, VIC Bioenergy Plant
Project Background
Location: Lilydale, Victoria – circa $53M + $6.5M O&M contract value
Delorean Corporation’s Engineering Division is in contract for the design, construction, operation, and
maintenance of Yarra Valley Water’s second food waste to energy plant at Lilydale, Victoria. This new facility
will be one of the largest food waste to energy facilities of its kind in Australia.
The total design and construction contract sum is $53M. Additionally, the contract includes a two-year
agreement for operations and maintenance (and an option for digestate management) by Delorean with a
value of $6.5M.
Project Update
During the reporting period, Delorean Corporation’s Engineering Division completed Major Civil works on the
Food Waste to Energy facility inclusive of earth works and concrete works. Installation of process and
infrastructure equipment well under way.
The site has completed over 30,587 hours without injury or lost time incidents (LTI’s) and completed an ISO
Quality and Safety audit with success.
Image 4-5: YVW Bioenergy Site
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
14
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Engineering Division (continued)
Ecogas, NZ Bioenergy Plant
Project Background
Location: Reparoa, New Zealand
Delorean Corporation’s Engineering Division was
contracted for the design, turnkey build and commissioning
of this bioenergy project in Reparoa, New Zealand. The
completed project is taking food organics from Auckland
City Council collections, with the energy produced
supplying a major greenhouse operation. This bioenergy
facility is New Zealand’s first commercial scale anaerobic
digestion plant.
Image 6: Ecogas Bioenergy Site
Project Update
In 1H FY2025, Delorean was actively involved in technical support of the operation and maintenance for the
Ecogas bioenergy facility. The plant, which reached Practical Completion in Q4 FY2023, has been successfully
producing green electricity and biofertilizer and improving all the time.
Blue Lake Milling, SA Bioenergy Plant
Project Background
Location: Bordertown, South Australia
Delorean Corporation’s Engineering Division was
contracted for the design, turnkey EPC and commissioning
of this world-first grain milling operation bioenergy plant.
The plant supplies renewable electricity, heat and
biofertiliser from ground out milled feed.
Project Update
Image7: Blue Lake Milling Bioenergy Site
In 1H FY2025, Delorean was actively involved in technical support of the operation and maintenance for the
Blue Lake Milling bioenergy facility. The plant, which reached Practical Completion in Q1 FY2023, has been
successfully producing green electricity and biofertilizer.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
15
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division
Delorean’s Infrastructure Division is responsible for development, ownership and operation of commercialscale anaerobic digestion bioenergy facilities in Australia.
During 1H FY2025, the Group executed contracts with Tanarra Group for a $30m corporate debt facility, with
$25m from that facility allocated to development of DEL’s first build, own, operate project: SA1. The facility
can be paired with non-recourse debt in the project SPVs, to enable DEL to move additional projects into build.
These activities will underpin the Company’s future growth trajectory, ensuring sustained momentum and
value creation.
SA1 Salisbury Bioenergy Plant
Project Background
Location: Salisbury, South Australia
This project will be one of Australia’s first to create green gas to mains utilising commercial and industrial
organic waste.
In Stage 1 it will process 70,000TPA of organic waste, generating 210 TJs of biomethane per annum. This will
contribute to 92,200 tonnes per annum emissions reduction, the equivalent of powering 5,120 homes with
green energy per year.
Project Update
In December 2024, the Delorean Board reached the Financial Investment Decision to proceed with the
construction of Delorean’s SA1 bioenergy project in Edinburgh Parks, South Australia. Procurement of all long
lead items has progressed, and site works have begun.
Image 9: SA1 Salisbury Bioenergy Project Site
Image 8: SA1 Salisbury Bioenergy Plant Render
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
16
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division (continued)
VIC1 Stanhope Bioenergy Plant
Project Background
Location: Stanhope, Victoria
In Stage 1, this facility will process 54,000TPA of organic waste. It will generate 15,400 MWh per annum of
green electricity and contribute to emissions reduction of 69,400tCO2e per annum. This is equivalent to
powering 3,850 homes with green energy every year.
Project Update
Following the agreement for the debt facility from Tanarra for the SA1 Project, Delorean’s focus for this
reporting period continued to be securing a complementary investment partner for the VIC1 project, which
will enable the company to fast-track the start of construction on this project, being the second of the
Company’s build, own, operate project portfolio. Approvals are in place and project is shovel ready for full
construction pending project finance.
Image 10: VIC1 Stanhope Bioenergy Plant Render
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
17
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division (continued)
Brickworks Bioenergy Project (NSW1)
Project Background
Brickworks Building Products (ASX: BKW) and Delorean are party to a landmark collaboration agreement to
build and operate bioenergy facilities that will be co-located at Brickworks’ brick manufacturing sites. The
facilities will convert organic waste to green gas and electricity for use in Brickworks’ operations.
The collaboration has commenced with Brickworks’ Horsley Park brick manufacturing site in NSW, and if
successful there is the potential for the model to be rolled out on a national basis.
Project Update
In H1 FY2025, Brickworks Building Products and Delorean continued to progress the Development Stage of the
NSW1 project under a Master Services Agreement (MSA). During the reporting period, the project closed out
the agency responses ready for submission for the development approval, and a focus of reaching FID by late
Q4 2025.
Image 11-12: NSW1 Bioenergy Plant Render
QLD1 Bioenergy Plant
Project Background
At full capacity, this site will process approximately 130,000TPA of organic waste with the primary energy
output being either biomethane or green electricity. The facility is likely to be developed with a staged
approach, with Stage 1 seeing 70,000TPA of waste accepted. This is equivalent to powering 9,000 homes with
green energy every year (based on full capacity).
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
18
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division (continued)
QLD1 Bioenergy Plant (continued)
Project Update
Delorean was active in the development of its QLD1 project during the period, following the award of $5m in
grant funding from the Queensland Government towards its construction in the previous period. This funding,
announced on 28 February 2024, is subject to planning approvals. The project is expected to be FID-ready by
late CY2025.
Image 13: QLD1 Bioenergy Plant Render
Delorean Energy Retail Division
Delorean’s Energy Retail Division is preparing for a strategic scale up of its retail operations as Delorean’s
Infrastructure assets come onstream. Delorean intends to retain its WA and National retail electricity and
Victorian Gas licenses on an ongoing basis in support of the Company’s rollout of bioenergy infrastructure
across Australia.
Delorean Corporate
Environment, Social and Governance
Delorean remains proud to be advancing its commitment to sustainability. In November 2024, Delorean
published its third annual ESG Report.
Delorean’s ESG report provides stakeholders with a comprehensive analysis of the Group’s Environmental,
Social and Governance (ESG) performance, highlighting key sustainability milestones achieved during the
Financial Year. Additionally, it offers an update on the Company’s continued progress towards future
sustainability goals.
DELOREAN CORPORATION LIMITED | INTERIM FINANCIAL REPORT 31 DECEMBER 2024
19
Directors’ Report (continued)
Operating and Financial Review (continued)
Planned Activity – H2 FY2025
In H2 FY2025, Delorean’s focus is in the following key areas:
Successful delivery and construction of Delorean’s SA1 Project after reaching internal FID.
Further focus of SA1 project contracted revenues in feedstock, biomethane and Biogenic CO2 offtakes.
Progression of the NSW1 project, working on detailed commercial terms and project finance options
with Brickworks, toward reaching an FID decision in H2 FY2025.