FY24 Annual Report
Released
Released
Announcement PDF
Australia’s future in bioenergy and renewables
Annual Report
2024
Delorean Corporation Limited
ACN 638 111 127
Table Of Contents
Company Overview ......................................................................................................................................... 3
Corporate Directory ........................................................................................................................................ 4
Investment Highlights ..................................................................................................................................... 5
Chairman’s Address ......................................................................................................................................... 6
FY2024 at a Glance .......................................................................................................................................... 8
Directors’ Report ............................................................................................................................................ 10
Auditor’s Independence Declaration ..............................................................................................................38
Consolidated Statement of Profit or Loss and Other Comprehensive Income ...............................................39
Consolidated Statement of Financial Position ................................................................................................40
Consolidated Statement of Changes in Equity................................................................................................41
Consolidated Statement of Cash Flows ..........................................................................................................43
Notes to the Consolidated Financial Statements............................................................................................44
Directors’ Declaration .....................................................................................................................................98
Independent Auditor’s Report ........................................................................................................................99
ASX Additional Information ..........................................................................................................................103
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
2
Company Overview
Annual Report
Vision
This annual report provides a summary of our
activities and performance for the financial
year ended 30 June 2024.
To be recognised as Australia and
New Zealand’s leading emerging
renewable energy generator
Mission
Delorean Corporation
We are a leading bioenergy company in
Australia, committed to sustainability and
innovation. Our solutions are paving the way
towards a greener future, reducing
environmental burdens and powering a
cleaner, more sustainable Australia.
To build, own and operate the largest
portfolio of commercially successful
renewable energy infrastructure in
Australia and New
Zealand,
measured by value of developed
assets and quantity of renewable
electricity, heat and renewable gas
produced.
renewable energy generator
d retailer, led by its fastgrowing
bioenergy
infrastructure footprint.
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
3
Corporate Directory
Directors
Mr Hamish Jolly
Mr Joseph Oliver
Mr David McArthur
Mr Stephen Gostlow
ASX Code
Shares: DEL
Company Secretary
Mr David McArthur
Country of Incorporation
and Domicile
Australia
Legal Form of Entity
Public Company
Contact Details
deloreancorporation.com.au
info@deloreancorporation.com.au
+61 8 6147 7575
Registered and Principal Office
Ground Floor
1205 Hay Street
WEST PERTH WA 6005
Corporate Governance Statement
https://www.deloreancorporation.com.au/
corporate-governance/
Postal Address
Ground Floor
1205 Hay Street
WEST PERTH WA 6005
Auditors
RSM Australia Partners Level 32,
Exchange Tower 2 The Esplanade
PERTH WA 6000
Bank
Commonwealth Bank of Australia Level
14B, 300 Murray Street Perth WA 6000
Share Registry
Automic Group
Level 2, 267 St Georges Terrace
PERTH WA 6000
Telephone: 1300 288 664
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
4
Investment Highlights
Delorean Corporation (Delorean) is Australia’s leading
bioenergy infrastructure developer, builder, owner and
emerging operator.
Delorean is a vertically integrated business operating in
two high growth investment sectors – renewable energy
and the circular economy.
The Company has a strong track record in delivering
engineering, procurement, and construction (EPC)
contracts for industry and government and is closing in
on its goal to roll out a backbone of Delorean-owned
bioenergy infrastructure projects across Australia,
supported by some of Australia’s most iconic companies.
Progressed a $30m
Corporate Financing
Package
$5.0m
EBITDA
$8.8m
Cash at Bank
Record NPAT
in FY24
Progressed
Brickworks NSW1
Joint Development
Advanced
SA1 / VIC1 Strategic
Partnerships
Unique high yielding investment opportunity in the bioenergy sector
✓ Delorean is the only Build-Own-Operate (BOO) Bioenergy developer in Australia with a strong track
record of delivering successful projects in ANZ
✓ Delorean is uniquely positioned to develop its strategic portfolio of BOO projects with significant
industry partners
Long-term value upside
✓ High margin business with contracted revenue flows – predictable and stable income once assets are
operational, underpinned by long-term contracts and attractive project economics
✓ Unique proposition on the ASX providing equity exposure to shovel ready projects that demonstrate
significant project-level IRRs
Attractive industry dynamics with strong growth potential
✓ Bioenergy industry has significant ‘green’ tailwinds driven by demand for renewable energy production
and waste diversion
✓ Use of organic waste to create gas enables sale of gas at a ‘green’ premium and at a time of significant
undersupply
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
5
Chairman’s Address
A Transformational Year – Kickstarting DEL’s Own Infrastructure
Financial Year 2024 was a transformational year for
Delorean Corporation with the Company posting a record
profit as a result of ongoing success in our base EPC
business, securing iconic strategic partnerships and
refocusing Delorean’s pathway for rollout of our BuildOwn-Operate bioenergy projects.
The Company continues to be buoyed by significant
tailwinds in the bioenergy industry with demand for
domestic green gas far outpacing supply and waste
diversion initiatives being a key plank in commercial and
government sector forward planning.
The Company’s focus on developing its BOO portfolio in
FY24 has culminated in the subsequent securing of a
partnership with Tanarra Group to finance the
construction of the SA1 project, the first in the Company’s
BOO portfolio. These Delorean-owned development
projects have demonstrated high project-level IRRs and
are key to unlocking the Company’s strategic objective of
securing annuity based and high-margin revenue
streams.
The Tanarra facilities enable the provision of a 3-year term corporate finance facility package of up to
$30m with the funds to be deployed to fund construction of the SA1 Project in Edinburgh Parks near
Adelaide in South Australia. The facility is flexible and will enable Delorean to progress the construction
of its second shovel ready project VIC1 (90% Delorean-owned) in Stanhope, Victoria in parallel to SA1.
The Company hopes to refinance the Tanarra construction facility in full at the 3-year maturity, with terms
in line with typical longer-term project financing solutions. SA1 construction is expected to commence in
Q2 FY25 with first gas expected in Q3 FY26, subject to Delorean’s Final Investment Decision (FID).
During the year, Delorean’s base EPC business continued to perform strongly with the successful
completion of the Ecogas bioenergy facility in New Zealand for project developer, Pioneer. We are pleased
to report that the Company is also engaged to provide an initial 2-year post-commissioning Operate and
Maintain (O&M) contract.
In January 2024 the Company also made a start on the $54m construction of Yarra Valley Water’s second
bioenergy facility in Lilydale, Victoria, with completion of construction scheduled for April 2025 delivering ongoing revenues into FY25 and follow-on O&M revenues post-commissioning.
In FY24, Delorean successfully secured $1.3m of earnings in execution of its trading strategy on Large Scale
Generation Certificates relating to the Company’s energy retail division, with that strategy set to continue
into FY25.
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
6
Outlook for The Year Ahead
Looking forward the Company expects sustainable earnings into FY25 with contracted EPC and O&M
revenues on its third-party Ecogas and Yarra Valley Water construction projects.
These cash flows will continue to support Delorean’s move into build of its SA1 and VIC1 BOO projects
enabling overhead recovery against these high-IRR projects. As these facilities become operational
(expected from Q3 FY26 onwards), they will generate revenues from fees for acceptance of organic waste
streams and from sale of renewable gas, green electricity and environmental credits. Delorean is
continuing to explore additional revenue streams, including the sale of natural byproducts such as
biofertiliser and commercial-scale carbon dioxide products.
In FY24, Delorean continued the collaborative development of the NSW1 BOO bioenergy project under
agreements with Brickworks, with this project reaching the next stage of development. The project is
expected to progress to Financial Investment Decision (subject to normal investment and funding
parameters) with Delorean commencing construction inside FY25.
Delorean was also active in the development of its QLD1 BOO project, for which it successfully secured
$5m in funding from the Queensland Government towards project construction. This funding, announced
on 28 February 2024, is subject to planning approvals and FID expected in FY25.
With a record year of profit under our belt, a solid revenue outlook for FY25 and now funded to kick off
construction of our high-yielding BOO project rollout, the prospects for Delorean have never been better.
A big vote of thanks to our dynamic team at Delorean and members of our Board, and to our shareholders
for their ongoing support for our company vision, which we believe will be well rewarded in shareholder
value as we continue to develop and bring onstream our own infrastructure in this high-growth sector.
Yours sincerely,
Hamish Jolly
Executive Chair
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
7
FY2024 at a Glance
In FY2024, Delorean Corporation achieved significant advancements across
multiple projects, further strengthening its position as a frontrunner in the
Australian bioenergy industry.
Financial
GROUP REVENUE
GROUP ASSETS UNDER MANAGEMENT
$ 27.9m
$ 28.1m
FY24
NET PROFIT AFTER TAX
FY23
$ 4.8m
FY22
OUTLOOK FOR THE FY2025
DEL BOARD ASPIRATIONAL STRATEGIC OBJECTIVE
$ 54m
$ 300m
Contracted Works FY25 and beyond
enterprise value by FY2028
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
$17.9m
$24.1m
8
Strategic
strengthening its position as a frontrunner in the
Engineering
Delorean is regarded as a leading contractor in the bioenergy industry.
3 award-winning
bioenergy
infrastructure projects
completed
$54m Yarra Valley
Water bioenergy project
in build
Zero lost time
incident rate (LTIR) –
a perfect safety record
Infrastructure
Delorean is the only Build-Own-Operate bioenergy developer in Australia, actively expanding its
strategic portfolio of BOO projects in collaboration with key industry partners.
$30m financing
package with
Tanarra Group
(completed Sept 2024)
Delorean QLD1 Project
awarded
$5m grant
Collaboration
agreement with
ATCO Gas
Advanced
DEL BOO
portfolio
Brickworks
NSW1 Joint
Development project
reached significant
milestones
Focused on securing
project finance for its
$500m
bioenergy portfolio
Corporate
Delorean has solidified its market position as the leader in the rapidly growing bioenergy sector,
enhancing both its operational efficiency and strategic capabilities to drive continued growth and
innovation.
Developed design
and process
Intellectual Property (IP)
Completed
ISO
certification audit to
ensure continued
compliance
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
New Chief Operating
Officer appointed;
strategic hires in
Engineering and
Infrastructure teams
9
Directors’ Report
The Directors’ present their report together with the financial statements of Delorean Corporation Limited
(“Delorean” or “the Company” or “DEL”) and its subsidiaries (“the Consolidated Entity”) for the financial year
ended 30 June 2024 and the auditor’s report thereon.
Our Board
Delorean’s Board comprises a balance of strong and committed executive leadership through its co-founders,
Executive Chair Hamish Jolly and Managing Director Joe Oliver, paired with Steve Gostlow’s deep knowledge and
track record in the Australian waste sector with Tox Free Solutions Ltd, and David McArthur’s decades of
experience in the complexities of ASX-listed businesses. The Board functions well with the Non-Executive
Directors providing guidance on finance, performance management and M&A strategy. Together, the Directors
hold 42.19% of DEL’s issued capital and are motivated to guide the Company to meet its growth and
profitability targets and realise the Company’s vision.
Strong Leadership
Hamish Jolly
Executive Chair & Co-Founder
Hamish is a seasoned executive and holds a Bachelor of Business (Business Law and Accounting) and is a
Member of the Institute of Chartered Accountants in Australia and New Zealand. He is a former Director of
Strategy and Ventures at Bankwest, and former CEO of Greening Australia, one of Australia’s largest
environmental NGO’s.
Joe Oliver
Managing Director & Co-Founder
Joe has over 15 years’ experience in engineering, power generation and renewable energy across both Australasia
and Europe. Prior to Delorean, Joe worked for Edina Ltd, specialising in power generation. Joe has been involved
in developing the UK Anaerobic Digestion sector delivering over 10 facilities nationwide through both Farmgen
Ltd and Monsal Ltd.
Steve Gostlow
Non-Executive Director
Steve has over 20 years’ experience in the waste management industry. He was Managing Director of Tox Free
Solutions Ltd (Toxfree) for 16 years where he developed Toxfree into one of Australia’s largest waste
management companies. Steve has formal governance qualifications as a Graduate of the Australian Institute of
Company Directors.
David McArthur
Non-Executive Director & Company Secretary
David is a Chartered Accountant, with over 30 years’ experience. David has sat on the board and been company
secretary for a number of listed companies including Lodestar Minerals Ltd (ASX: LSR), Xstate Resources Ltd
(ASX:XST), Australian Oil Company Ltd (ASX: AOK), as well as Harvest Technology Ltd (ASX:HTC). Additionally, he
was also chair of Audit and Risk Management Committee for all four.
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
10
Directors’ Report (continued)
Operating and Financial Review
Principal Activities
Delorean is a leading builder, energy retailer and developer of bioenergy infrastructure throughout Australia.
The principal activities of the Consolidated Entity during the financial year were:
•
•
•
•
Renewable energy asset investment
Development
Construction
Tank and infrastructure fabrication
Overview
Delorean Corporation was established in 2013 as a pioneering bioenergy EPC provider in Australia and New
Zealand. Delorean has successfully delivered 3 award-winning bioenergy projects (Jandakot WA, Blue Lake
Milling SA, Ecogas NZ). Currently, we are constructing our fourth and biggest project to date, valued at
approximately $54m, for Yarra Valley Water.
The advancement of Delorean’s infrastructure development pipeline has enabled Delorean to transition into
a ‘build, own and operate’ business model.
Delorean is driving revenue growth through three business segments:
• Infrastructure (core): The rollout of Delorean owned bioenergy projects through partnerships
• Engineering: Supporting the EPC and O&M of Delorean’s own projects, while selectively taking on thirdparty work
• Energy Retail: Retailing energy (electricity and gas) generated solely from Delorean projects
Company Highlights
✓ Delorean is a profitable business with a strong revenue growth profile – a business that has demonstrated
its ability to deliver award winning projects nationally and overseas.
✓ Delorean has the right team to execute – the management team brings over 50 years of combined
experience in the bioenergy industry. With strong industry connections and credibility, the team is wellpositioned to drive successful project execution.
✓ Delorean’s position in the market is unique – the Company has a mixture of EPC and O&M revenue
streams, combined with build- own-operate projects that are ready for construction, with a large portfolio
of development projects in strategic locations.
With a firm foothold in the renewable energy landscape and a strong commitment to driving positive change,
Delorean Corporation is incredibly well placed to capitalise on the major and long-term structural shift in gas
demand. Our steadfast commitment to advancing sustainable solutions and expanding our portfolio
exemplifies our purpose of shaping a cleaner future for Australia and New Zealand.
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
11
Directors’ Report (continued)
Operating and Financial Review (continued)
Bioenergy Plant Revenue Model
Bioenergy plants benefit from multiple revenue streams, deriving income from various sources such as waste
acceptance and processing, as well as sale of renewable electricity, heat and gas. Furthermore, there are
prospects for additional revenue streams in the future, including the sale of biofertiliser, CO2, hydrogen and
environmental credits. These opportunities contribute to the overall financial viability and sustainability of
bioenergy operations.
Attractive Industry Dynamics with Strong Growth Potential
Delorean is ideally positioned at the intersection of two high growth industries – waste management and
renewable energy.
Renewable Energy
The shift towards renewables is supported by active federal and state government action, with recent policies
focusing on meeting emissions, affordability, reliability and sustainability targets. Bioenergy is expected to
benefit from this trend, as it offers consistent baseload power that wind and solar power lack.
Waste Management
Governments across Australia are implementing policies to reduce landfill waste and transition to a circular
economy, including setting targets for landfill diversion and increasing waste levies. These trends are expected
to drive the urgency to divert organics from landfills and incentivize feedstock suppliers to find alternative
disposal options, further enhancing Delorean’s revenue from gate fees.
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
12
Directors’ Report (continued)
Operating and Financial Review (continued)
Vertically Integrated Renewable Energy Business
Delorean is a vertically integrated business operating in the organic waste management sector and the
renewable energy sector (particularly renewable gas). Both sectors have strong macro drivers for growth and
are rapidly developing.
Within this structure, Delorean has the inhouse capability to deliver bioenergy projects across the full lifecycle,
from project conception to commissioning and operation; processing organic waste and generating and
monetising renewable electricity, heat and gas.
EPC Projects progressing with DEL-owned Project Development and Build Pipeline
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
13
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Engineering Division
Revenue
EBITDA
FY24
$
FY23
$
26,557,063
5,907,124
3,138,787
(4,827,819)
FY2024 EBITDA shows the impact of advancing engineering projects across each phase of the project life cycle,
with the results of the Engineering Division returning to profit. The engineering division has been focused on
the project delivery of Yarra Valley Water’s bioenergy project and progressing design works across the project
portfolio, including supporting the infrastructure division with engineering detail for development approvals
and early-stage Front End Engineering Design and Operation and Maintenance support of our completed
projects.
Yarra Valley Water, VIC Bioenergy Plant
Project Background
Location: Lilydale, Victoria - $54M + $6.5M contract value
Delorean Corporation’s Engineering Division was awarded the contract for the design, construction, operation,
and maintenance of Yarra Valley Water’s second food waste to energy plant at Lilydale, Victoria. This new
facility will be one of the largest food waste to energy facilities of its kind in Victoria.
The total design and construction contract sum is $54M. Additionally, the contract includes a two-year
agreement for operations and maintenance (and an option for digestate management) by Delorean with a
value of $6.5M.
Project Update
Following the receipt of final regulatory and development approvals, completion of bulk earthworks and
concrete works, the project has entered the full construction phase. Anaerobic Digestion inlet and outlet tanks
are being constructed and shed and equipment installation is due to commence early October 2024.
Image 1 & 2: Yarra Valley Water Construction Works
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
14
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Engineering Division (continued)
Ecogas, NZ Bioenergy Plant
Project Background
Location: Reparoa, New Zealand
Delorean Corporation’s Engineering Division was contracted for the design, turnkey build and commissioning
of this bioenergy project in Reparoa, New Zealand. The completed project is taking food organics from
Auckland City Council collections, with the energy produced supplying a major greenhouse operation. This
bioenergy facility is New Zealand’s first commercial scale anaerobic digestion plant.
Project Update
In FY24, Delorean was actively involved in the technical support of the operation and maintenance for the
Ecogas bioenergy facility. The plant, which reached Practical Completion in Q4 FY2023, has been successfully
producing green electricity and biofertilizer.
Image 2: Ecogas bioenergy facility
Image 3 & 4: Ecogas Bioenergy Facility
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
15
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division
Revenue
EBITDA
FY24
FY23
$
$
1,244,605
164,566
385,588
(24,949)
Revenue for the Infrastructure Division relates to the Brickworks development contract in both financial
years. The growth in revenue and EBITDA for FY24 reflects the increased level of activity on the project as
development work accelerates through the planning approval process. Outside of Brickworks, the majority
of the Division’s expenditure is capitalised to the bioenergy portfolio of owned assets in the infrastructure
pipeline (i.e. SA1, VIC1), supporting the transition to Build Own Operate model.
Project Finance
Subsequent to financial year end (September 2024), the Group executed contracts with Tanarra Group for a
$30m corporate debt facility, with $25m from that facility allocated to development of DEL’s first build, own,
operate project: SA1. This result followed from a detailed review process of potential investment partners
undertaken throughout FY2024.
The facility will unlock the Group’s build, own, operate strategy, initiating our first project build and providing
a platform for further developments. The facility can be paired with non-recourse debt in the project SPVs, to
enable DEL to move additional projects into build. These activities will underpin the Company’s future growth
trajectory, ensuring sustained momentum and value creation.
SA1 Bioenergy Plant
Project Background
Location: Salisbury, South Australia
In Stage 1 it will process 70,000TPA of organic waste, generating 200 TJs of biomethane per annum. This will
contribute to 92,200 tonnes/annum emissions reduction, the equivalent of powering 5,120 homes with green
energy per year.
Project Update
Tanarra funding (as above) contains $25m for project build costs, which will be used to finance the
construction of the 100% Delorean-owned SA1 Project in Edinburgh Parks, near Adelaide, South Australia. The
project is currently shovel ready and construction is expected to commence in Q2 FY25.
Under Delorean’s build, own, operate strategy, the Company expects to see substantial value unlocked,
particularly upon completion of SA1 construction through to operation at full capacity, expected in Q3 FY26.
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
16
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division (continued)
Image 5 & 6: SA1 Salisbury Bioenergy Plant Render
VIC1 Stanhope Bioenergy Plant
Project Background
Location: Stanhope, Victoria
In Stage 1, this facility will process 54,000TPA of organic waste. It will generate 120 TJs of biomethane per
annum and contribute to emissions reduction of 69,400tCO2e/annum. This is equivalent to powering 3,850
homes with green energy every year.
Project Update
Tanarra facility is flexible to enable Delorean to progress the construction of its second shovel ready project
VIC1 (90% Delorean-owned) in Stanhope, Victoria in parallel to SA1. The project is currently shovel ready for
full construction pending project finance.
Image 7 & 8: VIC1 bioenergy plant render
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
17
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division (continued)
Brickworks / NSW1 Bioenergy Plant
Project Background
Brickworks Building Products (ASX: BKW) and Delorean have signed a landmark collaboration agreement to
build and operate bioenergy facilities that will be co-located at Brickworks’ brick manufacturing sites. The
completed facilities will convert organic waste to green gas and electricity for use in Brickworks’ operations.
The collaboration has commenced with Brickworks’ Horsley Park brick manufacturing site in NSW, and if
successful, there is the potential for the model to be rolled out on a national basis.
Project Update
In FY24, Delorean continued the collaborative development of the NSW1 BOO bioenergy project under its
agreements with Brickworks, with this project reaching the next stage of development. The project is expected
to progress to Financial Investment Decision, subject to normal investment and funding parameters, with
construction expected to commence in FY25.
Image 9 &10: NSW1 Brickworks Bioenergy Plant Render
QLD1 Bioenergy Plant
Project Background
At full capacity, this site will process approximately 130,000TPA of organic waste with the primary energy
output being either biomethane or green electricity. The facility is likely to be developed with a staged
approach, with Stage 1 seeing 70,000 tonnes per annum of waste accepted. This is equivalent to powering
9,000 homes with green energy every year (based on full capacity).
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
18
Directors’ Report (continued)
Operating and Financial Review (continued)
Delorean Infrastructure Division (continued)
Project Update
Delorean was active in the development of its QLD1 project and successfully secured $5m in funding from the
Queensland Government towards its construction. This funding, announced on 28 February 2024, is subject
to planning approvals and FID expected in FY25.
Image 11 & 12: QLD1 Bioenergy Plant Render
Delorean Energy Retail Division
FY24
FY23
$
Revenue
EBITDA
80,489
1,227,528
$
15,730,421
(526,662)
Energy Retail discontinued substantially all its operation in December 2022 but retained all of its existing
energy retail licenses in WA and the Eastern States to underpin its bioenergy infrastructure asset pipeline.
Overview
In FY24, Delorean successfully secured $1.3m of earnings in execution of its trading strategy on Large Scale
Generation Certificates relating to the Company’s energy retail division. This strategy is set to continue into
FY25.
Delorean’s Energy Retail Division is preparing for a strategic scale up of its retail operations as Delorean’s
Infrastructure assets come onstream. Delorean intends to retain its WA and National retail electricity and
Victorian Gas licenses on an ongoing basis in support of the Company’s rollout of bioenergy infrastructure
across Australia.
DELOREAN CORPORATION LIMITED | ANNUAL REPORT 2024
19
Directors’ Report (continued)
Operating and Financial Review (continued)
ESG Strategy
Delorean remains proud to be advancing its commitment to sustainability. In Q2 FY24, Delorean published
its second annual ESG Report and is actively preparing for the release of its third report in Q2 FY25.
Delorean’s ESG report provides stakeholders with a comprehensive analysis of the Group’s Environmental,
Social and Governance (ESG) performance, highlighting key sustainability milestones achieved during the
Financial Year. Additionally, it offers an update on the Company’s continued progress towards future
sustainability goals.
Guided by our purpose of “Shaping a cleaner future”, our impact framework is centered on our contribution
to the United Nations Sustainable Development Goals.
Delorean focuses its efforts on six key pillars that are relevant to our business and stakeholders, where we
believe we can have th
Share your feedback
Discover