2024 AGM Presentation
Released
Released
Announcement PDF
Catalysing Australia’s Bioenergy Sector
AGM Presentation
November 2024
www.deloreancorporation.com.au
Disclaimer
Important Notice & Disclaimer
This document is confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This document is neither a prospectus nor an offer to subscribe for Shares. The purpose of this presentation is to provide general information
about Delorean Corporation Ltd (“Delorean” or the “Company”). This presentation is current as at 28 November 2024 (unless otherwise stated herein) and the information contained in it is in a summary form and does not purport to be complete. The
information in this presentation remains subject to change without notice. It is not recommended that any person makes any investment decision in relation to the Company based solely on this presentation.
This presentation does not necessarily contain all information which maybe material to the making of a decision in relation to the Company. Any investor should make their own independent assessment and determination as to the Company’s
prospects prior to making any investment decision and should not rely on the information in this presentation for that purpose.
This presentation does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold securities in the Company. The securities issued by the Company are considered speculative and there is no guarantee
that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. This presentation is not, and does not constitute, an offer to sell, or the solicitation,
invitation or recommendation of an offer to buy, any securities in any jurisdiction, including the United States, and neither this presentation, nor any of the information contained herein, shall form the basis of any contract or commitment. The
information in the presentation does not constitute an advertisement for an offer or proposed offer of securities and does not constitute a representation that an offering will occur. No person is authorised to give information or make any
representation that an offering will occur.
Any securities of Delorean have not been, and will not be, registered under the U.S. Securities Act or the securities laws of any state or other jurisdiction of the United States and, if there is an offer of securities, may not be offered or sold in the United
States except in transactions exempt from or not subject to, the registration requirements of the U.S. Securities Act and any other applicable securities laws.
This presentation is presented for informational purposes only. It is not intended to be, and is not, a prospectus, product disclosure statement, offering memorandum or private placement memorandum for the purpose of Chapter 6D of the Corporations
Act 2001.
Except for statutory liability which cannot be excluded, the Company, its officers, employees and advisers expressly disclaim any responsibility for, and make no representations or warranty for, the accuracy or completeness of the material contained in
this presentation and exclude all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. The Company
accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any obligation to furnish the person with any further information.
This presentation contains “forward-looking statements” and comments about future events, including statements about Delorean’s expectations about the performance of its business. Forward-looking statements may include words such as
“anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “out-look”, “upside”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”, and other similar expressions. Indications of, and guidance on, future earnings and financial position and
performance are also forward-looking statements. Forward-looking statements, opinions and estimates provided in this presentation are based on assumptions and contingencies which are subject to change without notice. Forward-looking statements
including projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied upon as an indication, prediction or guarantee of future performance. Actual results may differ materially from those
expressed or implied in such statements and these differences maybe material. The forward-looking statements in this presentation involve known and unknown risks and other factors, many of which are beyond the control of, or unknown to,
Delorean, its directors, officers and employees, and may involve significant elements of subjective judgement and assumptions as to future events which may or may not be correct.
Such forward looking statements are based on information available to Delorean as at the date of this presentation. Recipients are cautioned not to place undue reliance on forward looking statements and except as required by law or regulation,
Delorean assumes no liability to update these forward-looking statements. Such statements speak only as of the date hereof, and Delorean has no obligation to update or revise any such statements to reflect any change in events, conditions or
circumstances on which any such statement is based.
No representation or warranty, express or implied, is made by the Company that the matters stated in this presentation will be achieved or prove to be correct. Recipients of this presentation must make their own investigations and inquiries regarding
all assumptions, risks, uncertainties and contingencies which may affect the future operations of the Company or the Company’s securities.
The Company does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully consider whether the
securities issued by the Company are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position.
Delorean Corporation Annual General Meeting | FY24
2
Delorean Corporation
Agenda
Speakers
Hamish Jolly
Co-Founder & Executive Chair
Contents
•
Chairman’s Address
•
Business of the AGM
•
Joseph Oliver
Co-Founder & Managing Director
•
•
Resolutions
• Voting Results
Managing Director’s presentation
Meeting closed
Yarra Valley Water Bioenergy Plant Construction, VIC
Delorean Corporation Annual General Meeting | FY24
3
Chairman’s Address
Hamish Jolly
Delorean Corporation
Hamish Jolly
Chair’s Welcome
Financial Year 2024 was a transformational year for Delorean
Corporation. The Company posted a record profit as a result
of ongoing success in our base Engineering, Procurement,
and Construction (EPC) business, while also securing iconic
strategic partnerships and refocusing Delorean’s pathway
and funding for the rollout of our Build-Own-Operate (BOO)
bioenergy projects.
(abridged version – the full address issued to
ASX separately)
Delorean Corporation (ASX:DEL) is proud to
pioneer the development of the bioenergy
industry in Australia.
Delorean Corporation is the only ASX-listed
company leading with bioenergy and
commercial production of renewable gas in the
form of biomethane.
We are a vertically integrated business
operating in two of Australia’s highest growth
industries – renewable energy and waste
management.
Delorean Corporation Annual General Meeting | FY24
Executive
Chair
Hamish Jolly
Co-Founder of Delorean
Corporation
Demand for domestic green gas is surging, as oil and gas
sector players, gas pipeline operators and large industrials in
hard-to-abate sectors actively seek renewable gas solutions
to address their Scope 1 emissions. With hydrogen still an
uneconomic solution, renewable biomethane stands out as
the cost-competitive option. Currently, there are only a few
evolving biomethane sources in Australia – landfill gas sites,
wastewater treatment, and Delorean’s national bioenergy
infrastructure development backbone.
As Australia’s leading bioenergy company, with a trackrecord of building successful projects and a multi-project
BOO portfolio under way, Delorean is incredibly well
positioned to service this growing market.
5
Delorean Corporation
Board of Directors
Delorean’s Board comprises a balance
of strong and committed executive
leadership through its co-founders,
Executive Chair Hamish Jolly and
Managing Director Joe Oliver.
Matched with Steve Gostlow’s deep
experience and company growth track
record in the Australian waste sector
with Tox Free Solutions Ltd, David
McArthur’s decades of experience in
the
complexities
of
ASX-listed
businesses, and Michael Phillip’s
extensive finance and investing
background across various industries
and continents.
Delorean Corporation Annual General Meeting | FY24
Joseph Oliver
Hamish Jolly
Steve Gostlow
David McArthur
Michael Phillip
Managing Director
and Co-Founder
Executive Chair
Non-Executive
Director
Non-Executive
Director &
Company Secretary
Non-Executive
Director
6
Managing Director’s presentation
Joseph Oliver
Delorean Corporation
Vision and Mission
Delorean Corporation (ASX:DEL) is the leading
bioenergy company in Australia, specialising in
the design, build, ownership and management
of bioenergy infrastructure, renewable energy
generation and retailing. Our solutions are
paving the way towards a greener future.
4
Our Vision
To be recognised as Australia and New Zealand’s leading emerging renewable energy
generator and retailer, led by its fast-growing bioenergy infrastructure footprint.
Our Mission
To build, own and operate the largest portfolio of commercially successful renewable
energy infrastructure in Australia and New Zealand, measured by value of developed
assets and quantity of renewable electricity, heat and renewable gas produced.
8
Delorean Corporation - Leading the Bioenergy Infrastructure Sector
Delorean Occupies A Unique Position In
The Australian Bioenergy Industry
Delorean is the only Build-Own-Operate (BOO) Bioenergy developer in Australia
with a strong track record of delivering successful projects in ANZ
Bioenergy industry has significant tailwinds, using organic waste to create
Green Gas in a domestic gas and Green Electricity short market
Delorean is uniquely positioned to develop its strategic portfolio of
Build-Own-Operate projects with significant industry partners
Unique proposition on the ASX providing equity exposure to
shovel ready projects that demonstrate significant project-level IRRs
Delorean Corporation Annual General Meeting | FY24
9
Delorean Corporation – Strategic Objective
Drive strong business growth and achieve an
enterprise value of $300m by FY2028
High-Yielding Build-Own-Operate Infrastructure Rollout and Operation
Selective engineering, procurement, and construction (EPC) For Third Parties
Multi-Year Operation & Maintenance (O&M) Contracts
Drive Sustainability & Support Client’s Net Zero Targets
Delorean Corporation Annual General Meeting | FY24
10
Delorean Corporation
Bioenergy Plant Revenue Model
Bioenergy Plants benefit from multiple revenue
streams, from acceptance and processing of waste
through to sale of energy
Illustrative revenue model
•
Cogeneration
Delorean Corporation Annual General Meeting | FY24
Bioenergy assets generate revenue from:
‒ EPC + O&M Margins
‒ Ownership & Operation of BOO Infrastructure:
• Acceptance of organic waste from commercial
and municipal sources
• Production and sale of renewable gas and
electricity
• Production and sale of environmental credits
generated by DEL projects (ACCU/LGC/RGGO)
• Production and sale of CO2 byproducts (upside
opportunity)
• Production and sale of biofertiliser as markets
develop (upside opportunity)
11
Delorean Corporation
FY24 Highlights
Delorean Corporation
FY24 Financial Overview &
ASX snapshot
$27.9M
FY24 Revenue
Group Earnings
$5.0M
EBITDA
Project Development
Investment in Infrastructure
Projects SA1, VIC1 & Pipeline to date
$11.9M
$8.8M
FY24 Cash Position
As at 30/6/2024
Current Cash Position
$7.2M
As at 28/11/2024
Tanarra Debt Funding
$30.0M
$9.8M drawn at 28/11/2024
Shareholders
ASX Code
DEL
Share Price
$0.18
Ordinary Shares on Issue
Market Cap
Delorean Corporation Annual General Meeting | FY24
(as at 28/11/2024)
40%
60%
220,278,153
$39.65M
Top 20
~43% of shares are held by the
founders/board
Focus 1: High-Yielding Build-Own-Operate Infrastructure Rollout and Operation
•
•
•
•
•
•
•
Secured $30m corporate financing package with Tanarra Group enabling BOO Projects
Advanced SA1 and VIC1 Strategic Partnerships
$45m grants applied for with $5M secured with the rest pending
Continued the development with Brickworks on a jointly-owned bioenergy plant in NSW
Advanced the Company’s BOO Infrastructure Development Portfolio
Furthered the development of relationships and partnerships with leading industrial, utility, and
energy players across Australia
Developed design and process intellectual property (IP) for bioenergy projects
Delorean Corporation
Achievements To Date
Financial Year 2024 was a transformational
year for Delorean Corporation with the
Company posting a record profit as a result of
ongoing success in our base EPC and Retail
business, securing strategic partnerships
supporting the decarbonization and energy
transition, refocusing Delorean’s pathway for
a national rollout of our Build Own-Operate
bioenergy projects.
Focus 2: Selective EPC and O&M For Third Parties
•
•
•
•
•
Focus 3: Drive Sustainability & Support Client’s Net Zero Targets
•
•
•
Delorean Corporation Annual General Meeting | FY24
Started the construction of Yarra Valley Water $53m Bioenergy project
Strong Focus on rolling out DEL award-winning IP across BOO Pipeline supporting engineering design
and commercial principles
Business improvements, implemented enhancements in the project management and delivery
processes and systems.
Successfully completed ISO accreditation audit for ISO 9001, 14001, 45001
Investment in Human capabilities
Furthered the development of relationships with leading industrial corporate companies across
Australia to support their net zero targets and energy transition reducing scope 1 emissions
Advanced DEL’s ESG Strategy and completed Scope 1 & 2 GHG Assessment
Released our third ESG Report
14
Delorean Corporation - Solidifying market position as leader in Australian Bioenergy Projects
Delorean Projects
1. BOO Infrastructure Rollout and Operation - $500m portfolio
Horizon
Project
COMPLETED
Status
1 SA1 Bioenergy Project
Jandakot
Bioenergy Project (WA)
Medium Term
2 VIC1 Bioenergy Project
Shovel Ready
3 NSW1 Bioenergy Project
In Development
4 QLD1 Bioenergy Project
In Development
5 WA2 Bioenergy Project
In Development
9x
Delorean Corporation Annual General Meeting | FY24
DEL Pipeline Projects
IN CONSTRUCTION
Fully Funded
Short Term
Long Term
2. EPC and O&M For Third Parties
Planning
Blue Lake Milling
Bioenergy Project (SA)
Ecogas
Bioenergy Project (NZ)
Yarra Valley Water
Bioenergy Project (VIC)
DEL EPC and O&M Bioenergy Projects*
*Indicative per State not geographically identified
15
Focus 1: High-Yielding BOO Infrastructure Rollout and Operation
SA1 Bioenergy Plant
First BOO Bioenergy Project in Australia
Tanarra $30m corporate finance package:
SA1
• Enables Delorean to immediately commence the first BOO Bioenergy Project
• Obviates the requirement for direct cash injection into projects
• Enables the construction to start on VIC1 through non-recourse financing in
parallel or once SA1 is refinanced
Feedstock:
• Feedstock secured across the project
• Direct identification of suitable waste in multiples of volumes required for the facility
Energy Offtake (Renewable Gas):
•
Offtake Contract in negotiation with large investment grade counterparty at a
premium to wholesale gas prices
Green Gas-to-Mains Bioenergy Projects
Location: Salisbury, South Australia
•
70,000tpa facility (stage 1)
•
210 TJ biomethane production
•
Emissions reduction 92,200 (tCO2-e/annum).
Energy Offtake (Green CO2):
•
•
Australian Carbon Credit Units (ACCUS)
Renewable Gas Guarantee of Origin (RGGO):
Approvals in place
Construction completion and first gas Q3
FY26
•
•
•
Offtake Contract in negotiation with large investment grade counterparty at
market prices with ability to capture green environment certificates
SA1 registered with the CER for ACCU’s environmental credits under established
methodologies including:
•
Diversion of organics from landfill
•
Generation of biogas from animal effluent
Renewable gas qualifies for RGGO’s and now registered with Green Power
Focus 1: High-Yielding BOO Infrastructure Rollout and Operation
Delorean Near-Term BOO Portfolio
NSW1
VIC1
QLD1
Australia’s first Green Gas Behind-the-Meter Project
Location: Horsley Parks, NSW
•
120,000tpa (full capacity) with ability for
150,00TPA
•
Emissions reduction of 138,035 (tCO2-e/annum).
Green Gas-to-Mains Bioenergy Project
Location: Stanhope, VIC
•
54,000tpa facility (Stage 1)
•
Emissions reduction 69,400 (tCO2-e/annum).
Green Gas-to-Mains Bioenergy Project
Location: Queensland
•
130,000tpa (full capacity)
•
Emissions reduction 161,960 (tCO2-e/annum).
•
•
•
•
Bioenergy plant located in a commercial
precinct exporting green gas to the gas
network or electricity to behind the meter
•
Awarded $5m grant with the QLD state
government to be deployed against the asset
cost, once in construction
•
•
Delorean and Brickworks continue to progress the
development to FID.
Development Approval in progress.
The project is working through registration
processes for various carbon and green
certification authorisations
Approvals in place
The project is currently shovel ready for full
construction pending project finance.
Focus 2 - Selective EPC and O&M For Third Parties
Delorean Third Party Projects
Successful delivery of 3 award-winning and innovative Australasian bioenergy projects
Richgro (WA)
Blue Lake Milling (SA)
Ecogas (NZ)
Yarra Valley Water (VIC)
Complete (2015)
• $9.5m contract value, flagship project.
• First facility of its kind in Australia to
commercially process mass organic waste
and to integrate with a composter.
• Payback on investment of less than 4 years,
ability to accept additional revenue from
gate fees (for feedstock).
• Electricity production equivalent to $400k
p.a.
• Ongoing Operation and Technical support
Complete (2022)
• $7.6m contract value
• First facility in the world to process Ground
Oat Milled Fines (“GOMF”) for power
production on site, behind the meter.
• Plant continues to produce green electricity
and biofertiliser, providing BLM with all power
requirements, surplus electricity exported to
the grid.
• Delorean and BLM received a commendation
for this project in the SA Premier's Awards
(Energy and Mining (Environment) Category).
• Ongoing Operation and Technical support
Complete (2023)
• $10.1m contract value
• New Zealand’s first commercial scale
anaerobic digestion plant.
• Practical completion has been achieved.
• The facility is successfully accepting
organic waste and generating biogas.
• Delorean’s Ecogas project won the Low
Carbon Future Award at the New Zealand
Energy Excellence Awards.
• Ongoing Operation and Technical Support
Current
• ~$53m contract value, $6.5m O&M value
• One of the largest food waste to energy
facilities of its kind in Victoria to commercially
process mass organic waste.
• Currently in Construction and due to be
completed and operational by May 2025.
18
Focus 3 - Drive Sustainability & Support Client’s Net Zero Targets
Commitment to ESG
Driving Sustainability Through Bioenergy
• Renewable Gas & Energy Production: Delorean’s projects produce green gas and electricity, supporting hard-to-abate sectors in reducing
emissions and transitioning away from fossil fuels, while also injecting green gas into existing mains infrastructure.
• Waste-to-Energy: Delorean’s projects convert organic waste into clean energy, reducing waste going to landfill, reducing emissions,
lowering waste disposal costs, and supporting a circular economy.
• CO₂ Recovery: Delorean’s projects capture high-demand, medical grade CO₂ for reuse.
• Expanding Infrastructure: With over $500m project portfolio, Delorean is scaling bioenergy solutions across Australia to meet renewable
gas and electricity demand and help Australia to meet the nation’s net zero targets.
For instance, the SA1 Bioenergy Project is projected to reduce emissions by ~3.7m tCO2e over its lifetime
Focus 3 - Drive Sustainability & Support Client’s Net Zero Targets
Commitment to ESG (cont.)
ESG is fundamental to Delorean’s long-term success
Our Environment
• Completed Scope 1 & 2 GHG Baseline
Assessment; committed to Scope 3
assessment
• Strengthened relationships with key
stakeholders to fast-track Delorean’s
Bioenergy infrastructure rollout,
reducing landfill waste and emissions
and producing green gas, electricity
and heat
• Actively invested in renewable energy
projects to support the transition to a
low-carbon economy
Our People & Safety
Our Governance
• Achieved zero Lost Time Injuries (LTIs)
and Medical Treatment Injuries (MTIs)
• Fostered a diverse and inclusive
workplace culture
• Continued accreditation compliance
• Developed an employee wellbeing
strategy
• Continued investment in employee
training and wellbeing initiatives
• Enhanced safety awareness through
regular employee engagement
• Continued management system
improvements
• Strengthened due diligence processes
and supplier assessments
• Ensured transparency and
accountability across all business
operations
• Maintained rigorous compliance with
legal and industry standards
• Reinforced a culture of integrity and
ethical conduct at all levels of the
organisation
20
Delorean Corporation
FY25 Outlook and Future Plans
Delorean Corporation - Leading the Bioenergy Infrastructure Sector
Future Plans and Roadmap
Focus 1: High-Yielding Build-Own-Operate Infrastructure Rollout and Operation
• Successfully deliver SA1 project on time and on budget
• VIC1, NSW1 bioenergy projects construction to start in CY25
• Strategic partnerships and locked in revenues for acceptance of organic waste, and
from sale of renewable gas, green electricity, CO2 and environmental credits.
Focus 2: Selective EPC and O&M For Third Parties
• Multi-year contracted O&M revenues on its third party Ecogas and Yarra Valley Water
construction projects
• Review selective EPC construction contracts for third parties
Focus 3: Drive Sustainability & Support Client’s Net Zero Targets
• Operational excellence and risk management
• Scope 3 emissions and set emissions reduction targets
Delorean Corporation
Key Investment Highlights
✓
Unique and proven track record of delivering award-winning, innovative and
successful Australasian bioenergy projects.
✓
Strong pipeline of bioenergy projects under development to capitalise on the
growth of Australian bioenergy market.
✓
A leading force in advancing Australia’s bioenergy sector and providing unique
solutions to address especially hard to abate sectors.
✓
Strong ESG credentials with TCFD and global ESG standards alignment, multiple
ESG certifications, and formal sustainability reporting
✓
Ideally positioned to capitalise on the national drive towards zero organic waste to
landfill and decarbonisation of energy.
23
Contact
Hamish Jolly
Executive Chair
Joseph Oliver
Managing Director
Ground Floor, 1205 Hay Street
West Perth WA 6005
Ground Floor, 1205 Hay Street
West Perth WA 6005
T (08) 6147 7575
info@deloreancorporation.com.au
T (08) 6147 7575
info@deloreancorporation.com.au
24
www.deloreancorporation.com.au
Share your feedback
Discover